Published February 23, 2025 at 7:00 PM
Updated March 5, 2025
Demolition, site work, paving and renovation of a mixed-use development in Lakeside, Montana. Completed plans call for site work for a 8,272-square-foot sidewalk / parking lot; for paving for a sidewalk / parking lot; for the renovation of a water / sewer project; communication facility; communication facility; and for the demolition of a water / sewer project.
Lakeside Wastewater Improvements Phase I - 2025 The Lakeside Wastewater Improvements Phase I - 2025 Project is the first phase of a large-scale wastewater treatment plant upgrade. The project will be separated into two separate schedules. Schedule One consists of the following: 1. Constructing a Septage Receiving Facility to provide pretreatment for septage from Flathead County before being pumped into the treatment process. The Septage receiving facility consists of a main building housing the septage receiving equipment, two lift stations, and an office. A biofilter will be constructed with a separate building to house the fan and biofilter equipment. The site will have a paved parking lot and a heated concrete slab near the septage unloading zone. There will be a potable water well and washdown area for septage trucks. 2. Installing approximately 5,700 linear feet of 6" HDPE septage force main, 4" HDPE future force main, 3" HDPE fiber optic conduit and cabling, and 4" HDPE non-potable water main to connect the septage receiving system to the treatment site. Additionally, 1,370 linear feet of the piping will be directionally drilled under a wetland area . Schedule Two consists of the following: 1. Constructing a Headworks Building equipped with mechanical screening and grit removal. The screening system will consist of three (3) Rotating Drum Screens each equipped with its own washer/compactor. The grit removal system includes a vortex grit chamber, grit pump, and grit washer. The Headworks Building will tie into the existing force main and screened wastewater will temporarily flow into the lagoon system until the mechanical treatment plant is completed in Phase Two. The Headworks Building will also house a plant lift station and non-potable water (NPW) wet well, pumps, and pressure tanks. Construction of a Biofilter and blower building to house biofilter equipment. 2. The Headworks Building Site work includes installation of yard piping for influent, NPW, and septage force main. Additionally, the contractor will construct a new access road, equipment pads, and retaining wall. 3. Demolition of the existing Irrigation Building and floor slab and replacing it will a new wood framed 12'x24' building. The contractor will install two vertical turbine pumps and interior piping, valves, and appurtenances. One pump will be reused, and pump treated lagoon water to the irrigation pivot. The other pump will convey water to the Headworks NPW wet well. The contractor will connect the irrigation piping to the existing irrigation force main and connect the NPW piping to the NPW main that is constructed with Schedule One of this project. 4. Demolition of Lift Station 10 and replacing it with a new Lift Station Building and pumps. Question Deadline 02/03/2025
Bid Results
Water / Sewer
$21,147,000.00
Public - City
Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2025
March 23, 2025
Multiple Locations, Lakeside, MT
Related To This Project
Lakeside, MT
--
Lakeside, MT
--
Lakeside, MT
Bid Date: Oct 23 2024
Lakeside, MT
Bid Date: Feb 25 2021
Lakeside, MT
Bid Date: Feb 20 2024
Lakeside, MT
Bid Date: Apr 24 2023
Bozeman, MT
--
Bozeman, MT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.