BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Casper, Wyoming. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Construction Manager At Risk North Platte Pedestrian Bridge Any questions which arise from this request shall be addressed to the City of Casper as follows: City of Casper Engineering Division Terry Cottenoir, Engineering Technician 307.235.8341 tcottenoir@casperwy.gov Site Address: Intersection of S. Poplar and W. 1st St Description: The procurement of Construction Manager At Risk (CMAR) services by a qualified CMAR firm to participate in a collaborative process to assist in the development, permitting, and design; to provide scheduling and budget input; to provide bidding services for potential sub-contractors; to influence the methods, phasing and sequencing of the construction phase; and participate in the construction delivery for construction of the North Platte River Pedestrian Bridge. The proposed North Platte River Pedestrian Bridge Project is a critical construction project for the City of Casper. The approximately two hundred thirty-foot (230') bridge would reroute pedestrians crossing the river from the vehicular bridge to the pedestrian bridge along South Poplar Street. The project will also include multi-use pathway connections to the existing pathways and sidewalks in the area, installation of lighting and upgrades to the sanitary sewer, storm sewer and water utilities in the area. The pedestrian bridge will not only provide a safe alternative to pedestrian traffic along South Poplar Street, it will also provide users easier access to the recreational activities associated with the North Platte River. Additionally, the bridge will act as a structure crossing for vital water and sewer utilities. The City of Casper is the recipient of a Wyoming Outdoor Recreation Grant (WORG) for the design and construction of this project. All work shall meet the requirements of the City, WORG, and Authorities Having Jurisdiction (AHJ) for work in the North Platte River and work related to soil contamination/mitigation areas such as BP/Amoco on this project.

GC Bidding

Bridges / Tunnels

$2,000,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

July 21, 2025

Project location map

W 1st St & S Poplar St, Casper, WY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.