BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 25, 2025

Site work for a water / sewer project in Moline, Illinois. Completed plans call for site work for a water / sewer project.

This project consists of the removal and replacement of inlets, catch basin special lids, patching and other incidental items for the City of Moline. For bidding purposes, the Contractor should acknowledge the project will encompass the entire city boundaries and that the work shall be done in several phases. Question Cut Off Date 1/27/2025 11:00:00 AM (CT) As per 820 ILCS 130/1, prevailing wages shall be required for this project.

Award

Water / Sewer

$104,880.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
96
Bidding Soon
1,232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

Project location map

Multiple Locations, Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.