BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work and paving for a civil project in West Palm Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Counties: Palm Beach Road Name: Tpk (Sr91) Improvements for Bridge Approaches (Mp 79.8) Limits: 93470000 Project(s): 45211115201(*) Federal Aid No: N/A Total Roadway Length: 0.504 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.504 Miles Contract Days: 200 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Please read the full advertisement Description: Work consists of providing all labor, materials, equipment and incidentals necessary for mitigating existing bridge approach slab deficiencies through polyurethane injections for the existing Turnpike Mainline (SR 91) bridge crossing over the Lake Worth Drainage District (LWDD) L-38 Canal at MP-79.8 in Palm Beach County, Florida. In addition, the travel lanes and shoulders approaching/departing the existing bridge will be resurfaced to correct minor profile deficiencies and improve rideability. No Pre-Bid Conference. Prequalification per Rule 14-22 is not required. Question Deadline 02/06/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 - Improvements for Bridge Approaches - SR91

Award

Bridges / Tunnels

$1,699,787.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
94
Bidding Soon
1,973
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 21, 2025

Project location map

FL-91, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.