Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2026 at 8:00 PM
Updated March 28, 2026
Site work and paving for a road / highway in Fayetteville, North Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://www.roadsbridges.com/road-construction/news/55332305/fayetteville-outer-loop-set-to-fully-open-after-26-years-in-the-works Key Takeaways The final five-mile segment between Camden Road and Raeford Road finished months ahead of schedule. The 39-mile connector links I-95 in Cumberland and Robeson counties, improving regional connectivity. The new route will reduce congestion, improve access to Fort Bragg, and provide an additional Cape Fear River crossing. Alex Grichenko | Dreamstime.com A view of a streetscape in Fayetteville, N.C., where a triangle in the roadway is shown. A streetscape in Fayetteville, N.C., where the Fayetteville Outer Loop was just completed. The final section of the long-planned Fayetteville Outer Loop will officially open to traffic on Nov. 25, marking the completion of a project first launched in 1999, according to WZFX. The 39-mile corridor links Interstate 95 in northern Cumberland County and I-95 in Robeson County, just south of the border with Cumberland County — a vast improvement to improving mobility in the region, according to The Fayetteville Observer. The last five-mile stretch of road between Camden Road near Hope Mills and Raeford Road in Fayetteville closes the final gap of the more than $1 billion project, The Fayetteville Observer reported. The segment’s contract totaled $151.8 million, according to WZFX. Construction on the final phase had been scheduled to finish next summer but was completed ahead of schedule, according to WZFX. Traffic will begin on the roadway immediately after the Nov. 25 ribbon cutting. Nearly 30 miles of the Outer Loop have been open since August. According to The Fayetteville Observer, the Outer Loop will improve access to Fort Bragg, reduce congestion on local streets, and provide better connections to north, south and west routes across the region. The new roadway will also offer another crossing over the Cape Fear River. --------------------------------------------- From Just West of SR 1112 (Rockfish Road) to Sr 1596 (Hope Mills Road) County : Cumberland Route : SR 1003 (Camden Road) Length (Miles) : 1.99 As of March 27, 2026 , the project is in Conceptual status Anticipated letting date is 2027 NC DOT - From Just West of SR 1112 (Rockfish Road) to Sr 1596 (Hope Mills Road) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$61,109,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2027
Camden Rd, Fayetteville, NC
Related To This Project
Fayetteville, NC
Bid Date: Mar 18 2025
Fayetteville, NC
Bid Date: Aug 19 2025
Fayetteville, NC
Bid Date: Mar 05 2025
Fayetteville, NC
Bid Date: Mar 11 2025
Fayetteville, NC
Bid Date: Mar 25 2025
Fayetteville, NC
Bid Date: Mar 17 2025
Fayetteville, NC
Bid Date: Apr 18 2025
Fayetteville, NC
Bid Date: Feb 18 2025
Fayetteville, NC
Bid Date: Feb 05 2025
Fayetteville, NC
Bid Date: Jan 27 2025
Fayetteville, NC
Bid Date: Jan 28 2025
Fayetteville, NC
--
Fayetteville, NC
Bid Date: Jan 15 2025
Fayetteville, NC
Bid Date: Jan 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
