BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work for a water / sewer project in Chester, Pennsylvania. Completed plans call for site work for a water / sewer project.

Water Main Relocation for Conchester Highway Question Deadline 02/04/2025 at 5:00 PM ET Location : online portal. It is anticipated that this Contract will run from April 1, 2025 to November 30, 2029. The work covered by this Contract will consist of installing water mains with associated work as shown on CWA project drawings. -Install GBP retire water mains as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Excavate, renew and/or reconnect services for this project as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Excavate and install new permanent hydrants, new valves and laterals to replace existing hydrants as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Retire water mains and hydrants as shown on CWA Project Drawings or as directed by the Authority's Engineer. The work to be completed under this Contract consists of supplying all plant, labor, equipment and material not otherwise indicated as being supplied by others that is required for the new water main and valves. Work shall include all excavation, backfilling, grading, installation of pipe, fittings, tapping sleeves, valves, valve insertions, hydrants, services, corporations, blowoff assemblies, temporary and permanent paving restoration required to complete this project assigned to the Contractor under this Contract. Establish necessary coordination meetings with PennDOT and municipal officials responsible for permit compliance and traffic maintenance. Furnish, install and remove all required plating over open excavations. Steel plates to be recessed into pavement on all PennDOT and heavily traveled roads. Install all water main, pipe spool pieces, fittings, valves, tapping sleeves & valves, and valve insertions as shown on CWA Project Drawings with all material being furnished by the Contractor. Furnish proper equipment, and furnish and use ascorbic acid in order to properly dechlorinate any chlorinated water discharged from any water mains. Contractor is to note that there are streams within the Project area. Excavate and properly backfill with select backfill material all access excavations to provide for piping connections, fittings, tapping sleeves and valves, and chlorination or flushing points. Furnish all necessary material and install all equipment to disinfect all new water mains as directed by the Authority's Engineer with copper, brass, and chlorine material furnished by the Contractor. See schedule under Section 2.28 and CWA Drawing No. 1438-S, sheets 13a~13h. Payment to be included under the main installation, access excavation, and blowoff installation bid items. 3/4-inch sample points are to be installed every 1,000 feet apart maximum or as directed by CWA and are to be included under the main installation bid item. There will be no separate payment for furnishing material and for performing this work. PIN- 06147-083, 06147-094

Award

Water / Sewer

$7,498,210.00

Public - City

Site Work

40

16

5

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
721
Active Projects
337
Bidding Soon
4,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 1, 2025

Project location map

Conchester Hwy, Chester, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.