Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2025 at 7:00 PM
Updated March 7, 2025
Site work for a water / sewer project in Chester, Pennsylvania. Completed plans call for site work for a water / sewer project.
Water Main Relocation for Conchester Highway Question Deadline 02/04/2025 at 5:00 PM ET Location : online portal. It is anticipated that this Contract will run from April 1, 2025 to November 30, 2029. The work covered by this Contract will consist of installing water mains with associated work as shown on CWA project drawings. -Install GBP retire water mains as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Excavate, renew and/or reconnect services for this project as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Excavate and install new permanent hydrants, new valves and laterals to replace existing hydrants as shown on CWA Project Drawings or as directed by the Authority's Engineer. -Retire water mains and hydrants as shown on CWA Project Drawings or as directed by the Authority's Engineer. The work to be completed under this Contract consists of supplying all plant, labor, equipment and material not otherwise indicated as being supplied by others that is required for the new water main and valves. Work shall include all excavation, backfilling, grading, installation of pipe, fittings, tapping sleeves, valves, valve insertions, hydrants, services, corporations, blowoff assemblies, temporary and permanent paving restoration required to complete this project assigned to the Contractor under this Contract. Establish necessary coordination meetings with PennDOT and municipal officials responsible for permit compliance and traffic maintenance. Furnish, install and remove all required plating over open excavations. Steel plates to be recessed into pavement on all PennDOT and heavily traveled roads. Install all water main, pipe spool pieces, fittings, valves, tapping sleeves & valves, and valve insertions as shown on CWA Project Drawings with all material being furnished by the Contractor. Furnish proper equipment, and furnish and use ascorbic acid in order to properly dechlorinate any chlorinated water discharged from any water mains. Contractor is to note that there are streams within the Project area. Excavate and properly backfill with select backfill material all access excavations to provide for piping connections, fittings, tapping sleeves and valves, and chlorination or flushing points. Furnish all necessary material and install all equipment to disinfect all new water mains as directed by the Authority's Engineer with copper, brass, and chlorine material furnished by the Contractor. See schedule under Section 2.28 and CWA Drawing No. 1438-S, sheets 13a~13h. Payment to be included under the main installation, access excavation, and blowoff installation bid items. 3/4-inch sample points are to be installed every 1,000 feet apart maximum or as directed by CWA and are to be included under the main installation bid item. There will be no separate payment for furnishing material and for performing this work. PIN- 06147-083, 06147-094
Award
Water / Sewer
$7,498,210.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
April 1, 2025
Conchester Hwy, Chester, PA
Related To This Project
Chester, PA
Bid Date: Sep 03 2025
Chester, PA
Bid Date: Dec 01 2025
Chester, PA
Bid Date: Dec 03 2025
Chester, PA
Bid Date: Apr 09 2019
Chester, PA
Bid Date: Aug 09 2024
Chester, PA
Bid Date: Feb 13 2024
Chester, PA
--
Chester, PA
Bid Date: Sep 21 2023
Chester, PA
Bid Date: Oct 09 2018
Chester, PA
Bid Date: Jun 26 2023
Chester, PA
Bid Date: Apr 11 2023
Chester, PA
--
Chester, PA
Bid Date: Feb 14 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
