BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Renovation of a mixed-use development in Cranfills Gap, Texas. Completed plans call for the renovation of a 13,614-square-foot, one-story above grade educational facility.

*As of March 31, 2025, project construction has just started. The Elementary School Renovation is expected to be completed on August 01, 2025, while the High School Renovation will be completed on October 01, 2025 High School & Elementary School Renovations The Project consists of the alteration of two existing campuses; Elementary (ES) and High School (HS) Renovate the following areas, complete including operational mechanical and electrical work and finishes: 1. Elementary School (ES) Modify existing restrooms to meet accessibility standards, replace existing HVAC units and systems, add new HVAC units, and replace existing steel windows with aluminum storefront systems. 2. HighSchool (HS) Major renovation of existing Gym & locker rooms; renovate existing male & female restrooms to meet accessibility standards, renovate existing Concessions area; and replace selected HVAC systems. CSP Packages available to prospective Proposers are as follows: CSP 01-B FINAL BUILDING CLEANING CSP 02-A DEMOLITION CSP 03-B CONCRETE CSP 04-A MASONRY CSP 05-A STRUCTURAL STEEL & ERECTION CSP 06-B WOOD FRAMING CSP 07-A ROOFING & SHEET METAL CSP 08-A FRAMES, DOORS & HARDWARE CSP 08-B GLASS & GLAZING CSP 09-A DRYWALL & ACOUSTICAL CSP 09-C TILING CSP 09-D FLOOR COVERINGS CSP 09-E PAINTING & WALLCOVERING CSP 09-G WOOD FLOORING CSP 10-A BUILDING SPECIALTIES CSP 10-D LOCKERS CSP 10-G IDENTIFICATION DEVICES CSP 11-A FOOD SERVICE EQUIPMENT CSP 11-E ATHLETIC EQUIPMENT CSP 12-B TELESCOPING BLEACHERS CSP 12-D WINDOW TREATMENTS CSP 22-A PLUMBING CSP 23-A HVAC CSP 26-A ELECTRICAL CSP 27-A VOICE & DATA CABLING CSP 28-A FIRE ALARM SYSTEMS CSP 31-E TERMITE CONTROL FOR QUESTIONS AND CLARIFICATIONS, PLEASE CONTACT NATHAN UMANOS, Nathan.Umanos@gallaghertx.com Renovation of Gym, Locker Rooms & Restrooms Question Deadline 01/31/2025 Every request for such interpretation should be received, via fax or e-mail, at least three days prior to the date fixed for the opening of proposals at (972) 633-0164 or e-mailed to Nathan.Umanos@gallaghertx.com.

Under Construction

Educational

$5,500,000.00

Public - City

Renovation

78

29

51

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
152
Bidding Soon
2,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 31, 2025

Project location map

505 S 2nd St, Cranfills Gap, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.