BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Renovation of an educational facility in Louisville, Kentucky. Completed plans call for the renovation of a educational facility.

This project consists of a boiler replacement at Farnsley Middle School in the Jefferson County Public School District. The existing gas-fired hot water boilers and boiler pumps will be replaced as part of this project. The existing piping will be reworked to support these replacements. The electrical scope is limited to supporting these replacements. JCPS will NOT be doing the controls on this project. The boiler unitary controller inside the Main Control Panel will be replaced with a new Alerton unitary controller and interfaced with the existing building automation system by a Temperature Controls Sub- Contractor as part of this project. Bid Guaranty in the form of a Certified/Cashiers Check or Bid Bond shall accompany each bid. The amount of the Bid Guaranty shall not be less than five percent (5%) of the bid set forth on the Form of Proposal. The Bid Guaranty shall be made payable to Jefferson County Public Schools. The Bid Guaranty shall be issued by a Surety Company that has an A.M. Best Company rating of A- or better. Refer to Supplemental Instructions to Bidders. Absence of this document will be grounds for automatic rejection of bids. Certified or cashiers checks will not be returned until Board approval of the successful bidder. Bids may not be withdrawn for a period of 45 days after the designated time for receipt of bids. Contractors Profile form, if not currently on file, is due prior to award of a contract. The Jefferson County Board of Education provides equal opportunities to all of its bidders with respect to the bidding and award of construction contracts. Jefferson County Public Schools requires that the bidder submit to the Facility Planning Unit, with the bid, the following information: 1. Proposal Form-properly signed, with completed unit prices and listing of all sub-contractors at time of submittal. A listing of manufacturers shall be submitted within 1 hour following the bid. 2. Bid Security-properly signed, witnessed and executed. 3. Minority, Women, and Veteran Business Enterprise Sub-contracting Plan; Contractors Good Faith Effort Summary Sheet, Affidavit, and Supplemental Sheet--properly completed, signed, and dated. NON-CONFORMANCE TO THE ABOVE REQUIREMENTS SHALL BE GROUNDS FOR REJECTION OF THE BID. where such acceptance, rejection or waiver is considered to be in the best interest of the Owner, and to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the contract documents. Refer to spec section JCPS Amendment to the General Conditions of the Contract for Construction for liquidated damages and substantial/final completion dates. Refer to spec section JCPS Amendment to the General Conditions of the Contract for Construction for requirements for 100% performance and payment bonds

Post-Bid

Educational

$86,000.00

Public - County

Renovation

13

15

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
123
Bidding Soon
1,588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 6, 2025

Project location map

3400 Lees Ln, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.