Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Renovation of an educational facility in Louisville, Kentucky. Completed plans call for the renovation of a educational facility.
This project consists of a boiler replacement at Farnsley Middle School in the Jefferson County Public School District. The existing gas-fired hot water boilers and boiler pumps will be replaced as part of this project. The existing piping will be reworked to support these replacements. The electrical scope is limited to supporting these replacements. JCPS will NOT be doing the controls on this project. The boiler unitary controller inside the Main Control Panel will be replaced with a new Alerton unitary controller and interfaced with the existing building automation system by a Temperature Controls Sub- Contractor as part of this project. Bid Guaranty in the form of a Certified/Cashiers Check or Bid Bond shall accompany each bid. The amount of the Bid Guaranty shall not be less than five percent (5%) of the bid set forth on the Form of Proposal. The Bid Guaranty shall be made payable to Jefferson County Public Schools. The Bid Guaranty shall be issued by a Surety Company that has an A.M. Best Company rating of A- or better. Refer to Supplemental Instructions to Bidders. Absence of this document will be grounds for automatic rejection of bids. Certified or cashiers checks will not be returned until Board approval of the successful bidder. Bids may not be withdrawn for a period of 45 days after the designated time for receipt of bids. Contractors Profile form, if not currently on file, is due prior to award of a contract. The Jefferson County Board of Education provides equal opportunities to all of its bidders with respect to the bidding and award of construction contracts. Jefferson County Public Schools requires that the bidder submit to the Facility Planning Unit, with the bid, the following information: 1. Proposal Form-properly signed, with completed unit prices and listing of all sub-contractors at time of submittal. A listing of manufacturers shall be submitted within 1 hour following the bid. 2. Bid Security-properly signed, witnessed and executed. 3. Minority, Women, and Veteran Business Enterprise Sub-contracting Plan; Contractors Good Faith Effort Summary Sheet, Affidavit, and Supplemental Sheet--properly completed, signed, and dated. NON-CONFORMANCE TO THE ABOVE REQUIREMENTS SHALL BE GROUNDS FOR REJECTION OF THE BID. where such acceptance, rejection or waiver is considered to be in the best interest of the Owner, and to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the contract documents. Refer to spec section JCPS Amendment to the General Conditions of the Contract for Construction for liquidated damages and substantial/final completion dates. Refer to spec section JCPS Amendment to the General Conditions of the Contract for Construction for requirements for 100% performance and payment bonds
Post-Bid
Educational
$86,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
March 6, 2025
3400 Lees Ln, Louisville, KY
Related To This Project
Louisville, KY
Bid Date: Feb 04 2025
Louisville, KY
Bid Date: Feb 05 2025
Louisville, KY
--
Louisville, KY
Bid Date: Feb 06 2025
Louisville, KY
Bid Date: Feb 23 2021
Louisville, KY
Bid Date: Jan 27 2021
Louisville, KY
Bid Date: Feb 13 2025
Louisville, KY
--
Louisville, KY
Bid Date: Feb 06 2025
Louisville, KY
Bid Date: Feb 05 2025
Louisville, KY
Bid Date: Feb 04 2025
Louisville, KY
--
Louisville, KY
--
Louisville, KY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
