BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2025 at 8:00 PM

Updated April 2, 2025

Site work and paving for a road / highway in Jasper, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Scope of Work: This project will be funded with 2025 LMIG and SPLOST funds. Construction includes asphalt milling, patching, resurfacing, and striping on Henderson Mountain Road, Philadelphia Road, Upper Salem at Airport Road, Salem Church Road, and Bryant Loop Road. Additional roads could be added/replaced at the Countys discretion. The work will include approximately 133,605 SY of Asphalt Patching using 14,696 tons of asphalt patching. See the attached location map exhibits. All work shall conform to the Georgia Department of Transportations (GDOT) Standard Specifications Construction of Transportation Systems, 2021 Edition; GDOTs Supplemental Specifications Construction of Transportation Systems, 2024; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions. Project work will be required to be complete by August 31, 2025. All punch-list items will be required to be complete within 30 days of the Final Inspection. Eligible bidders and subcontractors shall be licensed Contractors in the State of Georgia meeting all applicable insurance and bonding requirements as stipulated in the separate Instructions to Bidders and Contract Documents. It is recommended that the contractor be GDOT qualified. Verifying documents for the prime contractor/bidder will be required prior to contract award, and for all subcontractors prior beginning work. Work to Be Done: The Project Areas are: o Henderson Mountain Road o Philadelphia Road o Upper Salem at Airport o Salem Church Road o Bryant Loop Road The work to be performed under this contract consists of asphalt milling, patching, and resurfacing on specified roadway sections. The project includes general requirements such as traffic control, shoulder clipping, sweeping, and tack coat. All work and material shall be in accordance with the Technical Specifications and the contract documents. Question Deadline 02/04/2025 at 5:00 PM ET

Award

Roads / Highways

$2,001,060.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
204
Bidding Soon
2,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 17, 2025

Project location map

Multiple Locations, Jasper, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.