Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 24, 2025 at 7:00 PM
Updated November 25, 2025
Site work and paving for a bridge / tunnel in Avon Park, Florida. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of November 24, 2025, an engineer has been selected, and this project is in the early design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : Old Seven Mile Bdg & Pigeon Key Access Ovr Knight Chnl - BRI Plain Language Description : This project will consist of the preparation of contract documents including plans, specifications, supporting engineering analysis, calculations, and other technical documents for the rehabilitation of OLD SEVEN MILE BDG & PIGEON KEY ACCESS OVR KNIGHT CHANNEL - BRIDGE 900020. Some of the deficiencies to be addressed include but are not limited to substructure concrete repairs. Longlist Date/Time 2/12/2025 07:30 pm Shortlist Selection Date/Time 2/17/2025 08:30 pm Phase II Submittal Deadline Date/Time 3/05/2025 01:30 am Final Selection Date/Time 3/24/2025 07:30 pm Negotiations Period Begin Date 4/01/2025 Negotiations Period Ending Date 5/13/2025 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - Old Seven Mile Bdg & Pigeon Key Access Ovr Knight Chnl - BRI
Design
Bridges / Tunnels
$1,287,072.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2028
Multiple Locations, Avon Park, FL
Related To This Project
Avon Park, FL
Bid Date: Mar 05 2025
Avon Park, FL
Bid Date: Feb 12 2025
Avon Park, FL
Bid Date: Apr 14 2025
Avon Park, FL
Bid Date: Feb 24 2025
Avon Park, FL
--
Avon Park, FL
Bid Date: Mar 04 2025
Avon Park, FL
--
Avon Park, FL
--
Avon Park, FL
Bid Date: Feb 05 2025
Avon Park, FL
Bid Date: Jan 28 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
