Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2025 at 7:00 PM
Updated February 8, 2025
Site work and new construction of a mixed-use development in College Station, Texas. Completed plans call for the construction of a educational facility; for site work for a educational facility; laboratory facility; laboratory facility; pre-engineered storage facility; and pre-engineered storage facility.
Texas A&M University (Texas A&M) is seeking pricing for a Pre-Engineered Metal Building (PEMB) for the Construction Field Lab as per the details and specifications herein. If you have any questions in reference to registrations, please contact us at 979-845-2325. Question Deadline 01/31/2025 at 2:00 PM CT Bid Portal Texas A&M is looking for a pre-engineered metal building consisting of a 100-foot back wall and 40-foot right end wall. The building will need to have a total height of 25 feet to the top of the roof. The eave height should be 20 feet. The color requirement must be according to the RELLIS color standard. The roof will be required to be bright white. The back wall and right end wall will be required to be Light Stone. The trim (gable and eave) will be Galvalume plus. Installation is not needed. The building must be delivered no later than April 15, 2025. Bidder must submit building plans with bid response. Building plans will be subject to approval by a Texas A&M selected engineer prior to final acceptance.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$63,315.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
February 27, 2025
Multiple Locations, College Station, TX
Related To This Project
College Station, TX
Bid Date: Jan 29 2025
College Station, TX
Bid Date: Jan 30 2025
College Station, TX
--
College Station, TX
Bid Date: Feb 19 2025
College Station, TX
Bid Date: Feb 25 2025
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Feb 25 2025
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Jan 24 2025
College Station, TX
Bid Date: Jan 31 2025
College Station, TX
Bid Date: Jan 29 2025
College Station, TX
Bid Date: Mar 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
