BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 20, 2025

Site work for a water / sewer project in Defiance, Missouri. Completed plans call for site work for a water / sewer project.

The Contractor will be required to construct a water main extension along Highway D in Defiance, Missouri. The contractor will install approximately 3120 LF of 30" Ductile Iron water main, 530 LF of 30" Restrained Joint Ductile Iron water main, 540 LF of 36" HDPE water main, and related appurtenances along Highway D. This construction will include a connection to existing main on the eastern end and a plug for future construction at the west end of the run. Please direct all questions to David Mathon at dmathon@colestl.com The question period will conclude on february 13th, 2025, at close of business.

Post-Bid

Water / Sewer

$4,648,000.00

Public - County

Site Work

16

17

20

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
142
Bidding Soon
1,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 21, 2025

Project location map

Hwy D, Defiance, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.