BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Renovation of a municipal facility in Gasquet, California. Working plans call for the renovation of a municipal facility.

127EAW25R0008 - Patrick Creek Bathhouse Six Rivers National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $25,000 and $100,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, January 31st, 2025. An organized site visit will be held on Tuesday, January 28th, 10:00 AM PST. See page 30 for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. POJECT LOCATON Patrick Creek Campground sits at the confluence of Patrick Creek and the middle fork of Smith River in the vast Six Rivers National Forest of northern California. From the National Recreation Area Visitor Center in Gasquet, California turn left on Highway 199 and go 7.5 miles east. GPS Coordinates: 41 52' 30.468'' N123 50' 40.596'' W Maps included in Section J are general in nature and are not to be considered as definitively identifying locations. SCOPE OF CONTRACT The purpose of this project is to install eight new windows and two new doors to reflect the historical value of the original construction. The desired outcome will enable the continued adaptive reuse of this structure by the agency while enhancing and preserving their historic character. The Contractor should refer to the SCHEDULE OF ITEMS and project plans and specifications when making estimates of quantities or work. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications and drawings. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown. See attachment "1. Statement of Work" for further details.

Final Planning

Municipal

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
10
Bidding Soon
110
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

August 6, 2025

Project location map

To Be Determined, Gasquet, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.