BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work and paving for a road / highway in Bowling Green, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 17, 2025, project awarded. County - Warren Route - I-65/US-68 Item No. - 3-20.00 Project Description - Complete the I-65 / US-68 (Glasgow Road) diamond interchange by adding a northbound on-ramp and southbound off-ramp Project Manager - Stewart Lich, P.E. User Division - Highway Design Approximate Fee - $300,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - NH Funds (State & Federal Funds) Project Length - Approximately 0.4 miles The existing interstate interchange at Oakland is a half-diamond that is lacking northbound onramps and southbound off-ramps. Development both on US-68 and near the nearest northbound on-ramps and southbound off-ramps create a need for better connectivity at this interchange. The purpose of this project is to improve mobility and safety at Oakland. Adding two interstate ramps will complete the interstate interchange and improve northern connectivity for the local and surrounding community. It should also help reduce existing traffic currently forced to use alternate routes when traveling north. The ramp intersections at US-68 are expected to be improved to preserve mobility on US-68 and prepare for future development on the corridor. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. First Selection Meeting: February 10, 2025 Final Selection: February 26, 2025 Pre-Design Conference: March 5, 2025 Consultant Fee Proposal: March 14, 2025 Contract Negotiations: March 26, 2025 Notice to Proceed: April 16, 2025 The method of contractor selection has not been determined at this time. KY DOT - RFP Engineering - Complete the I-65 / US-68 (Glasgow Road) Diamond Interchange by Adding a Northbound on-Ramp and Southbound Off-Ramp

Award

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
72
Bidding Soon
1,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

Project location map

I-65 & US-68, Bowling Green, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.