Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 17, 2025 at 7:00 PM
Updated November 18, 2025
Site work and paving for a road / highway in Bowling Green, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of November 17, 2025, project awarded. County - Warren Route - I-65/US-68 Item No. - 3-20.00 Project Description - Complete the I-65 / US-68 (Glasgow Road) diamond interchange by adding a northbound on-ramp and southbound off-ramp Project Manager - Stewart Lich, P.E. User Division - Highway Design Approximate Fee - $300,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - NH Funds (State & Federal Funds) Project Length - Approximately 0.4 miles The existing interstate interchange at Oakland is a half-diamond that is lacking northbound onramps and southbound off-ramps. Development both on US-68 and near the nearest northbound on-ramps and southbound off-ramps create a need for better connectivity at this interchange. The purpose of this project is to improve mobility and safety at Oakland. Adding two interstate ramps will complete the interstate interchange and improve northern connectivity for the local and surrounding community. It should also help reduce existing traffic currently forced to use alternate routes when traveling north. The ramp intersections at US-68 are expected to be improved to preserve mobility on US-68 and prepare for future development on the corridor. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. First Selection Meeting: February 10, 2025 Final Selection: February 26, 2025 Pre-Design Conference: March 5, 2025 Consultant Fee Proposal: March 14, 2025 Contract Negotiations: March 26, 2025 Notice to Proceed: April 16, 2025 The method of contractor selection has not been determined at this time. KY DOT - RFP Engineering - Complete the I-65 / US-68 (Glasgow Road) Diamond Interchange by Adding a Northbound on-Ramp and Southbound Off-Ramp
Award
Roads / Highways
$300,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2026
I-65 & US-68, Bowling Green, KY
Related To This Project
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
Bid Date: Feb 05 2025
Bowling Green, KY
--
Bowling Green, KY
Bid Date: Feb 18 2025
Bowling Green, KY
Bid Date: Feb 28 2025
Bowling Green, KY
Bid Date: Feb 18 2025
Bowling Green, KY
Bid Date: Feb 18 2025
Bowling Green, KY
Bid Date: Mar 26 2025
Bowling Green, KY
Bid Date: Jan 23 2025
Bowling Green, KY
--
Bowling Green, KY
Bid Date: Jan 29 2025
Bowling Green, KY
Bid Date: Jan 23 2025
Bowling Green, KY
Bid Date: Jan 23 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
