EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Chicago Ridge, Illinois. Completed plans call for the renovation of a educational facility.

Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to Board of Education, Chicago Ridge School District 127.5, Chicago Ridge, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in-formalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). A. Requests for Interpretations: 1. Submit requests for interpretation of the documents in writing to the Architect. Inquiries received five or more days prior to the date fixed for opening of the Bids will be given consideration. 2. Responses to requests for interpretation will be issued as Addenda. Addenda will be issued to bidders of record. It is the responsibility of the bidders to check to be certain they have the issued Addenda. B. No verbal agreement, understanding, or conversation with an agent or employee of the Owner or Architect, either before or after the bidding period, shall affect or modify the terms or obligations of the bidding requirements. 1.14 CONSTRUCTION SCHEDULE A. Tentative Date of Board Approval of Bids: February 11, 2025 B. Tentative Commencement of Work on Site: June 9, 2025 C. Substantial Completion: July 18, 2025 D. Final Completion: August 11, 2025

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
154
Bidding Soon
2,058
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

June 9, 2025

img_map_placeholder

10800 Lyman Ave, Chicago Ridge, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Chicago Ridge SD 127.5 Building Controls at Ridge Central

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.