BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a mixed-use development in Edwardsville, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; service station / car wash facility; sidewalk / parking lot; and sidewalk / parking lot.

This project will reconstruction 1 mile of Goshen Road, add a 2.5 mile shared use path to Liberty Trail, reconstruct 0.3 miles of Old Troy Road, install roundabouts at three intersections, add electric vehicle charging stations and bicycle parking to Plummer Family Park, and include steam bank stabilization to culverts. As of October 23, 2025, this project is in the design phase. A firm timeline for construction has not been established. *Previous solicitation listed below for reference:* The City of Edwardsville, Illinois is issuing a Request for Proposals ("RFP") to IDOT Prequalified Engineering firms for preliminary engineering services for the Goshen Road and Liberty Trail Multimodal Transportation Improvements. The project will reconstruct approximately 1.75-miles of Goshen Road and Old Troy Road with solar lightening and green medians, convert approximately three intersections to roundabouts, construct approximately 2.9-miles of shared-use path along Old Troy Road and Goshen Road, update a bus stop, add approximately 10 EV stations and 3 bicycle parking facilities, and rehabilitate approximately 0.6-miles Goshen Road due to stream related flooding. It is anticipated that this project be on the November 2028 IDOT letting. This project is funded by a Federal RAISE grant. The City of Edwardsville reserves the right to consider any proposal and to reject any and all proposals if doing so best serves the public interest. Please e-mail all questions to rfp@cityofedwardsville.com The City of Edwardsville reserves the right at any time and for any reason to cancel this consultant procurement process, to reject any or all proposals, or to accept an alternative proposal. The City and/or staff may seek clarification from an offer at any time and respond promptly if there is cause for rejection. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$21,240,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
97
Bidding Soon
1,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2028

Project location map

Multiple Locations, Edwardsville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.