BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Site work and asbestos abatement for an educational facility in Edwardsville, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Question Deadline 01/01/2025 All requests and questions will be accepted until (3) business days before the opening of bids. Bids shall be clearly marked with "Asbestos Abatement Nelson and Hamel Elementary School - Secure Entries". Faxed and/or emailed bid proposals will not be accepted and bids received after stated time will not be accepted and will be returned unopened. No immediate decision shall be rendered concerning the bids submitted. After all bids have been tabulated and evaluated, they will be presented to the Board of Education for approval. PROJECT DESCRIPTION Nelson Elementary - Asbestos abatement of pipe insulation in plumbing chases and heat method abatement of floor tile under walls Hamel Elementary - Asbestos abatement of transite soffit and fascia on the exterior entrance of the building All plans and specifications can be obtained by contacting wynter@farmerenv.com, CONTACT INFORMATION Farmer Environmental Services, LLC 108 Emerald Hills Drive, Edwardsville, IL 62025: phone 618.656.6988; fax 618.656.8353; e-mail - wynter@farmerenv.com. BID STIPULATIONS Bids will be based on a single lump sum abatement. A Bid Bond or Certified Check made payable to the Project Owner (Board of Education - District #7) in the amount of 5% of the Base Bid shall accompany the Bid Package as a guarantee that the bidder, if awarded the contract, will furnish a satisfactory Performance and Payment Bond, execute the contract and proceed with the work. Upon failure to do so, they shall forfeit the deposit or amount of the Bid Bond as liquidated damages, and no mistakes or error on the part of the Bidder shall excuse the Bidder or entitle them to a return of the deposit or Bid Bond. The Board of Education Edwardsville CUSD #7 reserves the right to accept or reject any or all bids, to waive any informality in the bidding process, and to award a Contract for any part of the Work or the Project as a whole. It is the statutory policy of the State of Illinois that contractors and subcontractors shall pay prevailing wages pursuant to the Wages of Employees on Public Works Act (820 ILCS 130/1 et seq.). Illinois Preference Act (IL. Rev. Stat. Ch. 48, Par. 2201-2207) shall apply on all public works projects.

Award

Educational

$25,917.00

Public - City

Asbestos Abatement, Site Work

5

10

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
97
Bidding Soon
1,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

May 26, 2025

Project location map

Multiple Locations, Edwardsville, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.