BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2026 at 7:00 PM

Updated February 21, 2026

Site work for a religious / funeral development in Deadwood, South Dakota. Completed plans call for site work for a religious / funeral development.

The range of anticipated costs for the project is $112,400 to $130,000. Bid Security Will Be Required in the Form of a Cashiers Check or Certified Check in the Amount of Five (5) Percent of the Total for the Bid Submitted, or Through a Bid Bond of Not Less Than Ten (10) Percent of the Total for the Bid Submitted, Made Payable to the City of Deadwood. A Performance Bond is Also Required. Bids Will Be Sealed and Marked 2026 Mount Moriah Cemetery Project. Bids Will Be Mailed or Hand Delivered to the Deadwood Finance Office, 102 Sherman Street, Deadwood, South Dakota, 57732. The City of Deadwood Has the Right to Reject Any and All Bids. PRE-BID MEETING WILL BE HELD AT 2:00 PM LOCAL TIME ONTHURSDAY, JANUARY 29, 2026, IN THE CENTURY ROOM AT CITY HALL,108 SHERMAN STREET, DEADWOOD, SD. The work generally consists of concrete retaining walls, rebuilding concrete curbs, stucco replacement/repair, maintenance and repair of deteriorated concrete, vegetation restoration and stabilization of construction affected areas, and other Work indicated in the Contract Documents.

Award

Religious / Funeral

$133,250.00

Public - City

Site Work

38

11

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 16, 2026

Project location map

10 Mt Moriah Dr, Deadwood, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.