Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work for a water / sewer project in Lumberton, Mississippi. Completed plans call for site work for a water / sewer project.
Principal items of construction are as follows: Provide labor, materials, tools, and other necessary items required for the construction and placement of a permanent well, valves, and other miscellaneous items. A Bid Bond in the amount of 5% of the bid will be required with the proposal. Each bidder shall write his Certificate of Responsibility number and Mississippi License number on the outside of the sealed envelope containing his proposal. North Lumberton Utility Association reserves the right to reject any and all bids, to accept any bid deemed to be in the best interest of the Association, and to waive informalities. DESCRIPTION A. Scope: The work required under this section consists of the final inspections, submitting of all closeout documents and related items to complete the work indicated on the drawings and described in the Specifications. 1.02 FINAL INSPECTIONS A. ENGINEERs Inspection: The CONTRACTOR shall make written request for a final inspection to the ENGINEER; notice to be given ten (10) days prior to the inspection. A list of any deficiencies, compiled by the ENGINEER, will be corrected by the CONTRACTOR. If, in his judgment, the project is not ready for a final inspection, the ENGINEER may schedule another inspection. B. OWNERs Inspection: After the ENGINEER has ascertained the project to be ready, an OWNERs inspection will be scheduled within ten (10) days thereafter. The CONTRACTOR will have ten (10) days after the OWNERs acceptance to make any corrections of punch list items and to submit closeout documents. C. Correction of work before final payment: CONTRACTOR shall promptly remove from the OWNERs premises, all materials condemned for failure to conform to the contract, whether incorporated in work or not, and CONTRACTOR shall, at his own expense, replace such condemned materials with those conforming to the requirements of the contract. Failure to remedy such defects after ten (10) days written notice will allow the OWNER to make good such defects and such costs shall be deducted from the balance due the CONTRACTOR or charged to the CONTRACTOR in the event no payment is due
Bid Results
Water / Sewer
$972,471.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
March 6, 2025
To Be Determined, Lumberton, MS
Related To This Project
Lumberton, MS
Bid Date: Oct 20 2025
Lumberton, MS
Bid Date: Oct 20 2025
Lumberton, MS
Bid Date: Sep 12 2024
Lumberton, MS
Bid Date: Sep 12 2024
Lumberton, MS
Bid Date: May 13 2024
Lumberton, MS
Bid Date: May 06 2024
Lumberton, MS
Bid Date: May 06 2024
Lumberton, MS
Bid Date: Jun 19 2020
Lumberton, MS
Bid Date: Mar 19 2024
Lumberton, MS
Bid Date: Sep 25 2023
Lumberton, MS
Bid Date: Oct 03 2023
Lumberton, MS
Bid Date: Sep 19 2023
Lumberton, MS
Bid Date: Jul 25 2023
Lumberton, MS
Bid Date: Jan 31 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.