BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a mixed-use development in Voorheesville, New York. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

**As of July 8, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** CR Number: 2122650 The DBE goal for this project is: 6% There are no M/WBE goals for this project The EEO Employment goals for this project are: 3.2% Minority Employment Goal 6.9% Women Employment Goal Contract D040869 The projects limits extend from: NY 85A (Maple Rd) to CR 306 (Voorheesville Ave) along the east side of Pine St; Grove St to the driveway of 10 N Main St along the east side of CR 201 (N Main St); and Stonington Hill Rd to the Vly Creek along the south side of NY 85A (Maple Ave). The Work Includes Providing All Labor, Materials, Machinery, Tools, Equipment and Other Means of Construction Necessary and Incidental to the Completion of the Work Shown on the Plans and Described in These Specifications Including, but Not Necessarily Limited to the Following: Construction of Approximately 1.11 Miles of New Ada Compliant Sidewalks on the East Side of Pine Street From the Intersection of Ny 85a (Maple Rd) to Cr 306 (Voorheesville Ave), Along the East Side of Cr 201 (N Main St) From Grove St to the Driveway of 10 N Main Street, and Along the South Side of Ny 85a (Maple Ave) From Stonington Hill Rd to the Vly Creek. Additionally, It Involves the Installation of New Curb Along Ny 85a and Portions of Pine Street Within the Above Described Work Limits. No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening. The Village of Voorheesville reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids or to accept the one that in its judgment will be for the best interest of the Village of Voorheesville. All bids are subject to final review and approval by the Village of Voorheesville Mayor before any award of contract may be made. Receipt of bids by the Village of Voorheesville shall not be construed as authority to bind the Village of Voorheesville. The work will be substantially completed October 15, 2025, and completed and ready for final payment on November 14, 2025. All bids must include the completed Bid Form, Non-Collusive Bidding and Disbarment Certifications, and Lobbying Certifications. This is a unit price bid as described in the Instructions to Bidders. No bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. Question Deadline 06/10/2025 All questions about the meaning or intent of the bidding Documents are to be directed to Engineer.

Bid Results

Sidewalks / Parking Lot

$968,524.00

Public - State/Provincial

Paving, Site Work

29

9

11

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
200
Bidding Soon
2,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

August 18, 2025

Project location map

Multiple Locations, Voorheesville, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.