EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2025 at 7:00 PM

Updated February 11, 2025

Site work, paving and outdoor lighting for a mixed-use development in Wailuku, Hawaii. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

CML Phase VII, Part 1, Composite Liner and Related Improvements Site Work Interested parties may contact the County Engineers Mr. Sage Kiyonaga and Mr. Jonn Geer at phone number (808) 270-7850, or via email Sage.Kiyonaga@co.maui.hi.us and Jonn.Geer@co.maui.hi.us for directions to the site or with questions about the project. Proposal Must Be Downloaded, Filled Out, Signed, and Uploaded With Your Bid Submission, Along With Bid Bond. Bids, comments, or questions regarding the proposal should be addressed to: Jared Masuda Purchasing Specialist County of Maui Purchasing Division Telephone: 808-270-3816 Email: Jared.Masuda@co.maui.hi.us This project will primarily consist of fapproximately 16 acres of landfill composite liner. Other work includes construction of a new access ramp/road, installation of a gas monitoring probe, and crushing/screening of existing stockpiled rock/rubble/soil with product utilized within the project. The project work area is located on Pulehu Road approximately half-a-mile south of the Central Maui Landfill facility entrance. The north CML 99 acres parcel, where stockpiled rock/rubble/soil is located, is 1,000 feet north of the CML entrance facility. The County 209 parcel for off-site borrow source is located on west side of Kuihelani Hwy (Hwy 380) approximately 3.36 miles south of the intersection of Maui Veterans Hwy (Hwy 311) and Kuihelani Hwy (Hwy 380). The Contractor will be responsible to coordinate and sequence all aspects of construction that could affect landfill operations to ensure minimal impact to access and ability to efficiently carry out landfill operations throughout the construction period. Bidders must be qualified in compliance with Section 103D-310 of the Hawaii Revised Statutes. Bidders shall be licensed in accordance to Chapter 444, HRS, relating to the licensing of Contractors and any Specialty Contractors License. chase The Contractor, and his subcontractor(s), if any, shall comply with all applicable revisions of the law relative to the Prevailing Wage Schedule, as required under r Chapter 104. HRS. Project Contract Time is 60 calendar days, where it is critically important to the County to complete the project within the Contract Time. If the work is not completed within the Contract Time, the County shall be entitled to claim liquidated damages as addressed in subsequent sections. If the work is completed in fewer calendar days than the Contract Time, the Contractor shall be eligible for performance incentive payment as addressed in subsequent sections. No proposal will be considered unless accompanied by one of the following forms of bidder's security: cash, a cashier's check, a certified check on a bank insured by the Federal Deposit Insurance Corporation, or a bidder's bond executed by an approved surety insurer, made payable to the County of Maui in the manner, form, and amount required in Section 103D- 323 of the Hawaii Revised Statutes. The proposal guaranty shall be equal to at least five percent (5%) of the total of the bid submitted. Pre-Bid Meeting notes Interested Parties May Contact the County Engineers Mr. Sage Kiyonaga and Mr. Jonn Geer at Phone Number (808) 270-7850, or via Email Sage.kiyonaga@co.maui.hi.us and Jonn.geer@co.maui.hi.us for Directions to the Site or With Questions About the Project. Any questions pertaining to the bid process, of for help in submitting a bid, can be directed to Mr. Jared Masuda at 808-270-3816.

Bid Results

Roads / Highways

$13,674,310.00

Public - County

Outdoor Lighting, Paving, Site Work

38

24

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Central Heating Equipment, Fuel-Fired Heaters
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
26
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

img_map_placeholder

Multiple Locations, Wailuku, HI

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Central Maui Landfill Phase VII, Part 1,Composite Liner and Related Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.