EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a clubhouse / community center in Flint, Michigan. Completed plans call for the renovation of a clubhouse / community center.

As of March 07, 2025 this project has not yet been awarded. A timeline for the award was not yet been established. SCOPE OF WORK: The City of Flint, Finance Department of Purchases & Supplies, is soliciting sealed bids for providing: MOTT PARK CLUBHOUSE BASEMENT WATERPROOFING Scope of Work: Basement Waterproofing and Related Improvements 1. Waterproofing & Leak Prevention o Leaking Walls: o Inspect walls for cracks or other sources of water penetration. o Apply waterproofing solutions such as sealants or membranes on the interior walls. o Reinforce exterior waterproofing by digging trenches around the foundation, applying a waterproof membrane, and installing a drainage system, if necessary. o Ceiling Leaks: o Identify the source of the ceiling leaks (e.g., roof or upper floors). o Repair any cracks or holes in the ceiling. o Install waterproofing barriers above the ceiling. o Patio Sealing: o Apply water-resistant sealant to the surface of the patio to prevent water penetration. o Ensure proper drainage by installing a drainage system where needed to channel water away from the patio and foundation. o Soil Leveling Around Patio: o Re-grade the soil around the patio to ensure proper water runoff. o Create a slope away from the building foundation to prevent water pooling. 2. Structural Reinforcement o Steel Beams in Basement: o Inspect steel beams for corrosion or damage caused by moisture exposure. o Clean and treat steel beams with rust-resistant coatings. o Repair or replace any compromised beams. 3. Mold Remediation & Cleaning o Mold Cleaning: o Conduct a thorough inspection to identify all areas affected by mold. o Use appropriate cleaning agents to remove mold from walls, floors, and ceilings. o Install HEPA filtration systems during cleaning to ensure air quality. o Painting: o Apply anti-mold and moisture-resistant paint to all walls and surfaces in the basement after mold removal. o Use mildew-resistant finishes to prevent future mold growth. 4. HVAC & Ventilation o GVAC Installation (General Ventilation and Air Conditioning): o Install a dehumidification system or HVAC unit to maintain optimal humidity levels. o Ensure proper air circulation and drying in the basement to reduce condensation. o Install vents or exhaust fans to enhance airflow and prevent damp conditions. 5. Additional Measures o Ongoing Monitoring: o Set up moisture detection systems in critical areas of the basement. o Implement a maintenance schedule to regularly inspect and clean HVAC and waterproofing systems. Questions All written questions shall be directed Lauren Rowley, Purchasing Manager by Wednesday, January 22, 2025, by 10am EST to lrowley@cityofflint.com. Effective immediately upon release of these Bidding Documents, and until notice of contract award, all official communications from proposers regarding the requirements of this Bid shall be directed to: Lauren Rowley 810-766-7340 lrowley@cityofflint.com The City of Flint reserves the right to reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the City of Flint, or their designee, that the best interest of the City will be served by doing so. No bid will be considered from any person, firm or corporation in arrears or in default to the City on any contract, debt, taxes or other obligation, or if the Bidder is debarred by the City of Flint from consideration for a contract award pursuant to Section 18-21.5 (d) of Article IV of the Purchasing Ordinance of the City of Flint.

Bid Results

Clubhouse / Community Centers

$63,750.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Outlets and Inlets
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
117
Bidding Soon
1,387
All Active Projects
658
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

img_map_placeholder

2401 Nolen Dr, Flint, MI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mott Park Clubhouse Basement Waterproofing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.