Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Mayo, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Counties : Dist/st-wide, Lafayette, Taylor Road Name: Replace Mitered-End Sections Limits: Midpoint Project(s): 21472377201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 120 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 00 Days (acq. time) Description: This is a Business Development Initiative and the work under this Contract consists of supplying all materials, labor, equipment, Maintenance of Traffic (MOT) and incidentals for the removal, disposal, and replacement of concrete mitered-end sections for side drainpipes in accordance with the 2024-2025 Standard Plans for Road Construction, specifically Index 430-022 (Side Drain Mitered End Section) on various roadways in Lafayette and Taylor Counties. This is a Lump Sum Contract with only one pay item listed in the Contract. Prequalification per Rule 14-22 is not required. It is only necessary to submit the Small Business Affidavit (SBA) form once per year. Send a completed and notarized affidavit as an attachment to: SmallBusiness@dot.state.fl.us All Sublet work must be contracted to a small business or businesses as defined by the Department. The subcontractor must also submit a notarized Small Business Affidavit Form provided by the Department prior to the start of work. Proposal Guaranty of $500 is required for bids over $150,000 and may be in the form of a Cashiers Check, the BDI Bid or Proposal Bond (Form No. 375-020-16), or the standard Bid or Proposal Bond form, Form No. 375-020-09). A Contract Bond is not required for contracts $250,000.00 and less. Question Deadline 02/12/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 002 - Remove, Disposal, and Replace Concrete Mitered-End Sections - Dist/st-wide
Award
Roads / Highways
$98,524.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2025
March 21, 2025
Multiple Locations, Mayo, FL
Related To This Project
Mayo, FL
Bid Date: Mar 07 2025
Mayo, FL
Bid Date: Mar 19 2025
Mayo, FL
Bid Date: May 23 2025
Mayo, FL
Bid Date: Feb 19 2025
Mayo, FL
Bid Date: May 12 2021
Mayo, FL
Bid Date: Jan 15 2025
Mayo, FL
Bid Date: Jan 15 2025
Mayo, FL
Bid Date: Dec 11 2024
Mayo, FL
Bid Date: Dec 11 2024
Mayo, FL
Bid Date: Oct 04 2024
Mayo, FL
Bid Date: Sep 06 2024
Mayo, FL
Bid Date: Aug 22 2024
Mayo, FL
Bid Date: Apr 17 2024
Mayo, FL
Bid Date: Mar 13 2024
Mayo, FL
Bid Date: Mar 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.