Published February 27, 2025 at 7:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Philadelphia, Pennsylvania. Completed plans call for site work for a water / sewer project.
Construction of Green Stormwater Infrastructure in S 66th St From Allman St to Regent St (Est. > $5,000,000) Question Deadline 02/06/2025 WORK NO. S-50292-G ONSTRUCTION OF GREEN STORMWATER INFRASTRUCTURE in S. 66 th Street from Allman Street to Regent Street , Upland Street from 66th Street to Simpson Street , 66th Street from Woodland Avenue to Yocum Street , Greenway Avenue from 66th Street to Cemetery Ave and RELAY OF WATER MAINS IN Greenway Avenue from 66th Street to Cemetery Ave MBE -12% - 15% ; WBE - 10% - 13% A. This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; and placement and grading of specified stormwater and planting soils. B. Construction shall not begin until all erosion and sedimentation control facilities have been installed and approved by the Philadelphia Water Department (PWD). The Contractor shall minimize disturbance within the working area wherever possible, and restrict the limit of disturbance to the extent feasible. C. Landscaping related work is not included in the Contract. Landscaping work will be performed by a separate vendor under contract with PWD. 1.02 SUMMARY OF WORK A. The work of this Contract includes all work necessary to produce complete and fully usable green stormwater infrastructure facilities as shown and described in the Contract Documents. B. The work of this Contract has a designed service life of 100 years. Because of the great expense involved in detecting, locating, and repairing defects, only the best methods and materials, and the most skilled workers, shall be used in the performance of this work. C. The paving work of this Contract has a designed service life of 40 years. All such work shall conform strictly to the requirements of the Philadelphia Streets Department (for work in City Streets) and of the Pennsylvania Department of Transportation (for work in State Highways). D. Past experience indicates that inadequate compacting of backfill in water sewer, and stormwater trenches frequently results in premature failure of paving patches. The Contractor will be required to adhere to the specific placement and compaction requirements as directed elsewhere in these Specifications. E. Past experience indicates that overcompaction of subgrade in green stormwater infiltration trenches results in failure of infiltration systems. The Contractor will be required to adhere to the specific excavation of the subgrade preparation and grading as directed elsewhere in these specifications. F. The Contractor shall be required to maintain a clean, functional, and safe worksite at all times. Measures indicated herein are considered the minimum acceptable requirements to maintain a responsible worksite, although site-specific conditions may mandate additional measures on any given project. In such cases, the Contractor is required to be amenable and responsive to requests from PWD to increase site management procedures in place. Completion - (266) CALENDAR days PWD WORK NO. S-50292-DG
Bid Results
Water / Sewer
$762,963.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 10 - Specialties
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
April 28, 2025

Multiple Locations, Philadelphia, PA
Related To This Project
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Apr 08 2025
Philadelphia, PA
Bid Date: Mar 05 2025
Philadelphia, PA
Bid Date: Feb 19 2025
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Feb 07 2025
Philadelphia, PA
Bid Date: Mar 19 2025
Philadelphia, PA
Bid Date: Feb 25 2025
Philadelphia, PA
Bid Date: Feb 25 2025
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Feb 12 2025
Philadelphia, PA
Bid Date: Jan 24 2025
Philadelphia, PA
Bid Date: Feb 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Construction of Green Stormwater Infrastructure in S 66th St From Allman St to Regent St
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.