BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 14, 2025

Renovation of an educational facility in Palmview, Texas. Completed plans call for the renovation of a educational facility.

Fire Alarm System Replacement for Palmview High School (Turn-Key Solution) Any questions or inquiries related to this solicitation shall be made no later than January 25, 2025. La Joya Independent School District is requesting proposals from interested and qualified vendors to be provided in accordance with the terms, conditions and specifications established within this solicitation. La Joya I.S.D. will select the proposal(s) that provide(s) the best value to the District in accordance to the awarding criteria contained in this solicitation. La Joya I.S.D. uses an online bidding system to post and receive electronic bids. Additionally, you may contact the Purchasing Department at (956) 323-2100 for further assistance. The term for this proposal is from School Board approval date through the substantial completion date. WORK COVERED BY CONTRACT DOCUMENTS A. The following Summary of Work is intended as an aid to achieve an understanding of the various elements of work included in the project, as is not intended to be all-inclusive. Detailed descriptions of work and requirements are given in drawings and specifications. B. Specification division numbers are not intended to dictate WHO will be doing the work. The following scope of work includes work specified in Divisions 0, 1, 26. All the work must be done and coordinated, regardless of whether it is done under the Sub Contractor or by the General Contractor.Scope of Work: Provide all materials and labor associated with complete operational systems. Major items of work include, but are not limited to: 1. Fire Alarm Upgrades for Palmview High School (427,497 sq. ft.). a. Power Systems: Provide connections for fire alarm control panel, remote annunciator(s), voice evacuation panel(s), power supplies, etc. b. Fire Alarm System: Provide demolition, labor, material, and equipment related to the implementation of a fire alarm system replacement including fire alarm panels, voice evacuation panels, initiating devices (automatic/manual), indicating devices, raceways, and power supplies for a complete installation. Monitor and interfacing with Emergency Radio Responder Communication System, kitchen hood(s) fire suppression systems as well. c. Please provide storage units for materials as required and coordinate with school personnel. d. Demolition: All existing indicating and initiating devices shall be removed along with associated wiring. Existing rough ins can be reused at contractors' discretion as long they meet TDLR mounting heights and new devices installation requirements. e. Coordinate and engage with HVAC controls contractor for the proper installation/programming of the duct smoke detectors. Under Base Bid: Contractor is required perform radio signal testing utilizing local emergency responder radio frequencies. If radio frequency results are deemed inadequate by the Fire Marshall office the contractor shall provide an in-building radio signal amplification system to provide complete coverage in the building for the public safety agencies as required by the local AHJ (Authority Having Jurisdiction). System users shall receive and transmit radio signals from their portable radio units within the building." 2. Sequence of Construction: The existing fire alarm systems shall remain in operation until the new system is ready for the end user to operate. The switchover shall be closely coordinated with La Joya ISD maintenance and school staff and be scheduled so as not to disrupt school instructionElectrical requirements associated with work of this section. This includes the following: a. Power supply wiring to control panels, field-devices, and other devices requiring power at 120 volts and higher. b. UL listed plenum rated cable may be used above ceilings. Control wiring in exposed locations shall be concealed in EMT conduit. 4. Demolition: Disconnect fire alarm control panel for replacement. All existing wiring shall not be reused and be removed and properly disposed. Underground raceways to be abandoned in place.

Post-Bid

Educational

$300,000.00

Public - County

Renovation

12

8

6

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
22
Bidding Soon
409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 13, 2025

Project location map

3901 La Homa Rd, Palmview, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.