Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work for a water / sewer project in Anadarko, Oklahoma. Completed plans call for site work for a water / sewer project.

**As of April 21, 2025, the project was awarded to Mach Energy Services, LLC, with an awarded amount of $1,453,156.50.** Various Waterline Upgrades Project Activity: Various Water Line Upgrades CDBG Project Number: Bids must include assurances that the following provisions will be complied with: 1. Federal Labor Standards Provisions - US Department of Labor, 29 CFR 5; Subpart A - Davis-Bacon Act for the use of the appropriate Davis-Bacon prevailing wage rate(s) for the county and state in which the project is located; and Subpart B, Fringe Benefit Provisions. 2. HUD Section 3, 24 CFR Part 75 - public construction projects assisted under HUD programs that provide financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold at $200,000 requires that to the greatest extent feasible opportunities for training and employment be provided to lower-income residents of the project area and contracts for work in a substantial part by persons residing in the area of the project. 3. Section 109 - of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin, sex, religion, age, disability, or family status be excluded from participation in, be denied the benefits of, or be subjected to discrimination. 4. Non-segregated Facilities - Certification That Assures the Bidder Does Not Maintain or Provide Any Segregated Facilities. 5. Executive Order 11246 - Equal Employment Opportunity (Eeo); Provisions Require Affirmative Action and Prohibits Federal Contractors From Discriminating on the Basis of Race, Color, Religion, Sex, Sexual Orientation, Gender Identity, or National Origin. 6. Minority Business Enterprise and Women Business Enterprise Provisions Which Encourage Minority Owned Business and Women Owned Businesses to Bid on the Project. 7. Circular 570 - Assurances That Surety Companies Executing Bonds Appear on the Treasury Department's List and Are Authorized to Transact Business in the State Where the Project is Located. 8. Sam.gov Registration - Bidders Must Be Registered as Active in With No Exclusions in Order to Bid on and Receive a Federally Assisted Contract. 9. Build America, Buy America Act (Baba) - Enacted in the Infrastructure Investment and Jobs Act Requires All Iron and Steel Used in Federally Assisted Infrastructure Projects Costing Over $250,000.00 Must Be Produced in the United States. *cdbg State Program Note - Hud Established a Bap Phased Implementation Waiver for Its Programs Based on the Date When Funds Were Obligated to the State. Iron and Steel, Effective 2023; Specifically Listed Construction Materials Added 2024; Not Listed Construction Materials and Manufactured Products Add 2025. Est. Value Notes: $1,003,000 Site Address: 501 W. Virginia Description: 7,500 L.F. of 6" waterline C900 DR-18 101 L.F. of 4" waterline C900 DR-18 260 L.F. of 6" Poly DIPS DR-11 Directional Bore 1,545 L.F. of 12" Bore & Steel Casing All appurtenances, pavement cut and repair, customer meter connections and testing for a fully functional system as outlined in the plans and specifications. The Owner Reserves the Right to Reject Any or All Bids, Waive Any Irregularities or Technicalities Without Assigning Reason Therefore, and to Make the Award in the Best Interest of the Owner. Bid Must Be Awarded to the Lowest, Responsive, and Responsible Bidder Pursuant to the Oklahoma State Competitive Bidding Act of 1974 as Amended. Documents notes A Hard Copy Set May Be Obtained at the Office of Wdb Engineering, Pllc Located at 6330 Se 74th Street, Oklahoma City, Ok 73135 Upon Payment of $150.00 Per Set. If Obtaining a Hard Copy Set, Please Notify Wdb Engineering, Pllc at Least 24 Hours Prior to Picking Up the Hard Copy Set. Hard Copy Sets May Be Mailed to the Bidder Only if the Bidder Provides a Fedex or Ups Account Number to the Sender, Wdb Engineering, Pllc. Refunds Will Not Be Made. Each bid (100,000.00 or more) must be accompanied by a bid bond payable to the Owner for five percent (5%) of the total amount of the bid. As soon as the bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible bidders. When the agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The bid bond of the successful bidder will be retained until the payment the payment bond and performance bond and/or statutory bond have been executed and approved, after which will be returned. A certified check may be used in lieu of the bid bond. A performance bond and a payment/statutory bond, each in the amount of 100 percent of the contract price and each with a corporate surety approved by the Owner, will be required for the faithful performance of the contract. Attorneys-in-fact who sign bid bonds are payment bonds and performance bonds must file with each bond a certified copy of their Power of Attorney bearing the effective date. The party to whom the contract is awarded will be required to execute the agreement and obtain the performance bond and statutory bond within ten (10) calendar days from the date when Notice of Award is delivered to the bidder. The Notice of Award shall be accompanied by the necessary agreement and bond forms. In case of failure of the bidder to execute the agreement, the Owner may consider the bidder in default, in which case the bid bond accompanying the proposal shall become the property of the Owner. The Owner, within ten (10) days of receipt of acceptable performance bond, statutory bond and agreement signed by the party to whom the agreement was awarded, shall sign the agreement, and return to such party an executed duplicate of the agreement. Should the Owner not execute the agreement within such period, the bidder may, by written notice, withdraw the signed agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Owner. For any change orders, Contractor shall provide BABA documentation for any new products or materials required by the change. Installation of materials or products that are not compliant with BABA requirements shall be considered defective work. Contractor should ensure that Engineer/Architect has an approved Manufacturer's Certification or waiver prior to items being delivered to the project site. By submission of an application for payment, based in whole or in part on furnishing equipment or materials, Contractor certifies that such equipment and materials, to contractor's knowledge, are compliant with BABA requirements. When alternate bids are taken, they will be listed in numerical order with the highest priority being number one, second priority being number two, etc. When alternates are used, the low bidders will be selected by the lowest and best bid, considering all bids, which include the selected alternate bids. The alternates will be listed in consecutive priority order to remain within the funds available for the project. The low bidder shall supply the names and addresses of major material suppliers and subcontractors when required to do so by the Owner. Inspection trips for prospective bidders will leave from the office of the CITY OF ANADARKO, located at 501 W. Virginia, Anadarko, Oklahoma 73005. The engineer is WDB Engineering PLLC, Address 6330 SE 74th Street, OKC, OK 73135. SPECIAL NOTES TO BIDDERS: As a part of the bid on this project, the successful bidder will be required to meet all requirements of the Oklahoma Underground Facilities Damage Prevention Act, 63-142, OKIE 811, when engaged in work within the public right-of-way in the same manner as in private right-of-way. The Owner reserves the right to reject any bid if the evidence submitted by or investigation of such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the agreement and to complete the work contemplated therein. A condition or qualified bid will not be accepted. Award will be made to the lowest responsible bidder. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. Each bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the contract documents. The failure or omission of any bidder to do any of the foregoing shall in no way relieve any bidder from any obligation with respect to its bid. Further, the bidder agrees to abide by the requirements under Executive Order No. 11246, as amended, including, specifically, the provisions of the Equal Opportunity Clause set forth in the Supplemental General Conditions. Further, all products must meet BABA requirements. Contractor shall include Manufacturer's Certification for BABA requirements with all applicable submittals. If a specific manufacture is used in the bidding, a statement that Manufacturer will comply with BABA must be included with the bid submission. Contractor shall comply with BABA requirements, including coordination with manufacturers, distributors, and suppliers to correct deficiencies in any BABA documentation. Engineer/Architect approval of shop drawings or samples shall include review of BABA documentation. Contractor shall certify upon completion that all work and materials have complied with BABA requirements.

Award

Water / Sewer

$1,453,157.00

Public - City

Site Work

25

7

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
36
Bidding Soon
670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 25, 2025

Project location map

Multiple Locations, Anadarko, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.