BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 31, 2025

Site work for a water / sewer project in Endicott, New York. Completed plans call for site work for a water / sewer project.

Village of Endicott (Owner) is requesting Bids for the construction of the following Project: Twist Run Tank Rehabilitation The Project includes the following Work: Tank Rehabilitation of a pre-stressed wire wound concrete tank rehabilitation, including concrete repair and coating installation. A pre-bid conference will not be held for this project. All questions prior to the bid opening must be received by the close of business on Thursday, January 23, 2025, at 5:00pm local time. Questions shall be directed to Hunt Engineers, Architects, Land Surveyors, & Landscape Architect DPC, to Harley Connelly at connellyh@hunt-eas.com or 607-358-1000. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Harley Connelly - connellyh@hunt-eas.com or 607-358-1000. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for the opening of Bids may not be answered. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. The Work of this project consists of the coating of all interior and exterior surfaces of the concrete water tank as outlined in these Contract Documents. Repairs, repainting, testing and disinfection are to be performed in accordance with AWWA D-102 standards. B. Concrete tank dimensions 67ft wide and 38ft. high. C. Base Contract will be for interior work and Alternates will be for exterior work. D. For claification, the interior coating work shall include the floor, walls and stop at the start of the dome. E. The Interior Contractor shall coordinate with the Owner and Engineer on and off site. F. The Interior Contractor shall remove existing overflow screens and replace with non-corrodible 24-mesh screens secured in place with non-corrodible hose clamps, or other method acceptable to Engineer. G. The Interior Contractor shall remove sediment and chemically clean interior of tank. H. The Interior Contractor shall temporarily remove all manway or hatch seals prior to coating. I. The Interior Contractor shall prepare steel manway and interior piping for epoxy coating. J. The Exterior Contractor shall inject grout where there are indications of leaks.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
138
Bidding Soon
1,596
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

To Be Determined, Endicott, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.