BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated June 17, 2025

Site work for a bridge / tunnel in Waukesha, Wisconsin. Working plans call for site work for a bridge / tunnel.

CTH T - Pewaukee River Tributary Structure *This project plans to rebid in the future.* Scope of Work. The work under this contract shall consist of excavation for structures, dewatering and bypassing flow, partial removal of steel culverts, culvert lining and pressure grouting, foundation backfill, structure backfill, concrete masonry culverts, bar steel reinforcement, grading, riprap, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

Final Planning

Bridges / Tunnels

$500,000.00

Public - County

Site Work

26

5

2

3

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
132
Bidding Soon
2,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

June 5, 2025

Project location map

N Grandview Blvd & Co Hwy T, Waukesha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.