Renovation of a municipal facility in Charleston, West Virginia. Completed plans call for the renovation of a municipal facility.

The Facilities Construction R&A East CMT of the United States Postal Service is soliciting proposals for a Roof Replacement project, at the United States Postal Service owned P&DC 1000 Centre Way, Charleston, WV 25309-9426, Kanawha County. Please see attached Summary of Work. The estimated cost of the work is between $7,000,000.00 - $7,500,000.00; with construction completion no later than (270) calendar days after receipt of the Notice to Proceed. The solicitation will open 1.17.2025 on USPS eSourcing Coupa (see How to Participate below) and close on 2.17.2025. A pre-proposal meeting for this project will be held on 2.5.2025 at 1030A. Attendance is not mandatory but is strongly recommended. Technical inquiries are to be addressed to Jeremy Duncan, Architect/Engineer, Roth Brothers, at 540-333-4562, or the USPS Project Manager, Joshua Boots at 724.553.7431. The Postal Service bases contract award decisions on best value. The Postal Service is more concerned with making an award at the lowest overall price than with obtaining superior technical or management features. However, the Postal Service may not necessarily make an award at the lowest price in order to achieve a small price savings if better value can be achieved with superior technical or management features. The benefits of a higher priced proposal may merit a higher price. MINIMUM REQUIREMENTS: Technical Evaluation Plan: Sections include Eligibility, Bonding Information, Financial Condition & Capability, Supplier Capability and Past Performance. The Technical Evaluation Plan will be assessed and scored on a scale of 100 points. Solicitation Attachment 11 contains the scoring breakdown. Price Proposal: Signed Offer and Award (Page 1), Schedule of Values (see eRFX Excel Attachment), Schedule of Unit Prices (if applicable), and Schedule of Alternates (if applicable). Affirmation of Contract Terms & Conditions. Terms & Conditions: Acknowledgement of Solicitation Amendments (if applicable), Solicitation Provision F-202: Key Personnel; Provision 4-3: Representations and Certifications (Section A., B., E.); Provision 9-1: Equal Opportunity Affirmative Action Program; and Provision F-401: Authorized Negotiators. Form VETS-4212 Documentation is required. If you are not registered with Department of Labor Report System, you must register on the DOL website at: https://www.dol.gov/vets/vets4212.htm and provide proof of registration. Bonding: Contractor must have the ability to obtain 100 percent performance and payment bonds for this project within seven (7) calendar days of receipt of a Notice of Intent to Award. Contractor will be responsible for coordination of all work in a manner that will not interfere with operations and coordinate all work related to this phased project with the Facility Manager or designee. Note: Successful offeror will be required to submit a Sub-Contracting Plan and Project Specific Safety Plan acceptable to the USPS Contracting Officer before a Notice to Proceed (NTP) is issued. The successful offeror will be bound by the Contractor's Screening Requirements. Offerors must familiarize themselves with the requirements of Clause F-102. HOW TO PARTICIPATE IN THE OPPORTUNITY All proposals must be submitted online in USPS eSourcing Coupa (Supplier Registration (usps.com) ). USPS eSourcing Coupa is a web-based electronic solicitation platform. If your organization wishes to participate in this solicitation, please see the attached Coupa registration instructions. If you have any questions on the registration process, contact Ryan Price at ryan.d.price@usps.govOnce you complete the registration process, the Postal Service will review the entry within seven (7) business days to ensure it is complete and accurate. Upon approval, you will be notified via e-mail of your log-in credentials. Each organization must "accept" the Invitation in order to place a bid in Coupa. Any required documentation may be attached to your bid after submitting total dollar amount of bid in Coupa. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms "Offeror" and "Contractor" are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner's sole responsibility to clarify design and construction responsibilities among the Owner's designers, contractors and other agents. B. The scope of work is listed within Articles 1.2 and 1.3 of this Section. C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply. D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall applySUMMARY OF ROOF REPLACEMENT WORK - AREAS A AND B A. Provide an alternate price for temporary interior protection. Refer to Section 015617. B. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project. C. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100. D. Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Refer to Section 053123 for re-fastening requirements. E. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Section 053123. F. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.

Post-Bid

Municipal

$7,500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
30
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

April 18, 2025

Project location map

1000 Centre Way, Charleston, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.