EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 23, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Newark, New Jersey. Completed plans call for the renovation of a educational facility.

Question Deadline 01/23/2025 at 12:00 PM ET All questions shall be submitted in writing via the bidding platform The specific section and page number to which each question refers to is to be indicated. Answers will be provided at least seven days prior to the acceptance of bids. SCOPE OF SERVICES A. Equipment Requirements Newark Board of Education intends to purchase and install Uninterruptible Power Supply (UPS) in its Main Distribution Frame (MDF) locations in up to 77 schools to protect its Network Core switches and Wide Area Network edge switches from unexpected network outages due to power fluctuations and or environmental conditions. The equipment at the school will require up to 1000 Watts of power. The District is requesting pricing for American Power Conversion (APC) Smart-UPS 1500VA LCD RM - UPS - 1000W (Watts) - 1440 VA ("volts amps") 120V (SMT1500RM1U) with APC UPS Network Management Card with Environmental Monitoring (AP9631) and rail kits for both two pole and four pole racks or an equivalent solution. At the Central Office location, we need 9 APC Smart-UPS SRT 6000 On-Line, 6kVA/6kW("kilo Watt"), Rackmount 4U, 208V, 2x L6- 20R+3x L6-30R NEMA outlets, Network Card + Smart Slot, Extended runtime, W/ rail kit. This will replace the existing UPS hardwired to power each IDF closet. Along with each UPS, we will need compatible switched and managed PDUs ("power distribution unit") to connect our equipment. Information documenting the equivalence of alternative equipment (in features and performance) is the responsibility of the proposed vendor. It must include trade publication(s) reference documentation to facilitate the District's assessment. The requested documentation must be provided for each part substituted with an equivalent part for the corresponding bid to be considered valid. Bids that do not provide the requested documentation will be regarded as non-compliant. Due to space limitations in the District's Main Distribution Frame (MDF) rack, the 1000W solution must be a maximum of 1U ("rack units"), while the 6000W solution can be larger than 2U.

Post-Bid

Educational

$430,000.00

Public - City

Renovation

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
350
Bidding Soon
5,079
All Active Projects
2,445
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

School Network Uninterruptible Power Supply (Ups) Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.