Published January 21, 2025 at 7:00 PM
Updated January 22, 2025
Site work, paving and outdoor lighting for a mixed-use development in Lakewood, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
This long corridor has been set up in a multi-phase approach. The first phase of work was identified as that portion of 100th St SW between Lakeview drive and South Tacoma Way. In 2023, the City was awarded the design phase by PSRC. The grant will fund design to 100% but will also aid the City in identifying the required Rights of Way necessary for construction. The current work consists of designing roadway surface improvements, curb, gutter, sidewalks, street lighting, drainage, a new signal at 40th Ave SW and identification of any ROW acquisition needs. 100th Street is a major east-west connector arterial roadway with improvements westerly of Lakeview Drive. From Lakeview Drive east to South Tacoma Way, there are limited sidewalks, curb, gutter, or bike lanes. 100th Street is a five lane arterial with a center turn lane and one major street intersection at 40th Avenue SW. Completion of this segment of 100th Street SW will significantly improve the non-motorized connection between South Tacoma Way to the downtown core by ensuring sidewalk connectivity. Phase 1 - Lakeview to South Tacoma Way, Design funded via PSRC Grant - $413,231 Grant, $119,659 City, unfunded ROW and Construction is estimated at $4,401,400 in 2028 dollars. Phase 2 - Lakeview to 59th Ave SW - The City received a grant for the resurfacing of 100th Street between Lakewood Drive and Lakeview Avenue. This work will only include mill/overlay and channelization. As of January 21 ,2025 This project is included in the County's 2025-2030 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$5,179,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
100th St S, Lakewood, WA
Related To This Project
Lakewood, WA
Bid Date: Feb 20 2025
Lakewood, WA
Bid Date: Feb 19 2025
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
Bid Date: May 01 2025
Lakewood, WA
Bid Date: Feb 28 2025
Lakewood, WA
Bid Date: Jan 31 2025
Lakewood, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.