BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2025 at 7:00 PM

Updated February 14, 2025

Renovation of an educational facility in Winston Salem, North Carolina. Completed plans call for the renovation of a 12,543-square-foot educational facility.

Contractor will bid to remove existing bleachers at Parkland High and move to Hanes Middle School. Contractor will bid to install new polymer telescoping bleachers at Parkland High. o Contractor will bid to refinish existing gym floor with new school logo. o ALTERNATE BID: Contractor will bid removal of existing gym floor and the installation of new wooded floor with logo. o SEE ADDITIONAL SCOPE OF WORK ATTACHED TO END OF TIDS BID PACKAGE o Contractor will be responsible for all require permits and inspections o Contractor shall provide all labor and material to provide tum-key project o Contractor shall remove all excess material, equipment, parts and trash at the completion of . project. o Contractor will be responsible to repair any damage utilities at their own cost. Corrected work must be inspected by WSFCS Maintenance department before covering Contractor will bid to remove existing bleachers at Parkland High and move to Hanes Middle School. Contractor will bid to install new polymer telescoping bleachers at Parkland High. o Contractor will bid to refmish existing gym floor with new school logo. o ALTERNATE BID: Contractor will bid removal of existing gym floor and the installation of new wooded floor with logo. o SEE ADDITIONAL SCOPE OF WORK ATTACHED TO END OF THIS BID PACKAGE o Contractor will be responsible for all require permits and inspections o Contractor shall provide all labor and material to provide turn-key project o Contractor shall remove all excess material, equipment, parts and trash at the completion of project. Bleacherscopeof work o Remove existing bleachers at Parkland High School, keepingall needed parts to install them at Hanes Middle School o Existing bleachers should be installed at Hanes Middle School fully operational and meet all safety standards. o New bleachers should be motorized, Power: 208 V, Single Phase, 30 Amp o New bleachers should be telescoping Stands o New bleachers should be Wall or Floor Mounted o Each bleacherrow shall becompromisedofrisers, seat and deck components, and a complete set of supportive columnsand braces. o Structural Performance: Telescopingstandsshall withstandthe effects of gravity loads, operational loads, and other loads and stresses according to ICC 300 o Accessibility Standard: Comply with applicable provisions in the DOJs 20210ADA Standards for Accessible Design. Wheelchair accessible seating locate cutouts to provide wheelchair -accessible seatingfortwo locations in each section. . o Brands: Hussey Seating Company, Intercal, LLC, Irwin Telescoping Seating, Royal Stewart Ltd. Material: Polymer -o --- o o Color: Parkland High School Colors (provided by WS/FCS) o Warranty all labor and installation for one year. Partsand equipment will carry manufacture warranty. o Lumber components are kiln dried, fingerjointed, edge glued southern pine of grade "B &B Finish" manufactured to the current SPIB glued-laminated standards for southern pine. o Self-Storing End Rails-Provide steel self-storing 42" high self-storing end guard rails with tubular supportsand vertical intermediate members to comply with all code requirements. Rails shall be fitted to each exposed bank end from third row and above with all steel-to-steelconnections. Finish shall be a black polyester powder coated. o Wheels: Non-marking soft rubberfaced wheels* assembly under each support column. o All seating shall be adjusted for smooth and proper operation.

Post-Bid

Educational

$475,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
147
Bidding Soon
1,751
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 17, 2025

Project location map

1600 Brewer Rd, Winston Salem, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.