Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 3, 2025 at 7:00 PM
Updated May 28, 2025
Site work for a water / sewer project in Ontario, California. Working plans call for site work for a water / sewer project.
This Design-Build Project consists of upgrades to On-Site Sodium Hypochlorite Generation (OSG) systems across five potable water well sites, which will include replacement of outdated, unsupported equipment and replacing old failing equipment & piping, and construction of new rooms and buildings to accommodate the new equipment at the following well sites: * Well 24 - Northeast corner of I-10 and Haven Avenue * Well 30 - 202 S. Wineville Avenue * Well 35 - 625 E. Main Street * Well 36 - Southwest corner of Jurupa Street and Archibald Avenue * Well 38 - 837 N. Center Avenue The estimated cost for the future design and construction for the OSG Phase 1 Upgrades is $8,000,000. Compliance with the Skilled and Trained Workforce requirements of 2600 -2603 & 22164(C) of the California Public Contract Code is MANDATORY The OSG system consists of many components including but not limited to: * Brine system - Brine tank, Brine booster, Salt Storage Area * OSG Unit - either 1 or 2 units per site capable of making 20lbs/day to 100 lbs/day of .8% (<1%) sodium hypochlorite solution. Each unit has a power supply, control valves, brine pumps, PLC/Controller, electrolytic Cell, and all appurtenances related to SCADA * Storage Tank - 500-1500 Gallon Single wall poly hypochlorite Storage tank with float switches to control Miox units and a radar level transmitter connected to City's programmable logic controller * Water softeners - 2 tanks in series (Provided by City) * Injection System - 2 ProMos 40 hydraulic injection pumps, SS injection Panel with Toshiba G series VFD's - G9 or latest * Coordination with the City's SCADA Software Engineer - The City works exclusively with Freedom Automation Inc for our software engineering needs The City of Ontario exclusively uses OSG Units manufactured by Miox, the VFD's are Toshiba G series, match City's Design Standards & injection pumps are Prominent Chemical Metering pumps. OMUC uses passive hydrogen venting in all OSG Units and tanks. Most equipment at the sites will have to be removed and disposed of or returned to the City for surplus, OMUC will determine on-site at the time of construction. All piping & chemical injections lines will need to be removed and replaced. In accordance with 22164(b) of the California Public Contract Code ('CPCC'), all potential Design-Build ('DB') Teams must be prequalified in accordance with the criteria established in 22164 of the CPCC and by the City. To be prequalified, DB-Teams must include a prime contractor who possesses a valid California Class A General Engineering Contractor's License and a valid Class C-10 Electrical Contractors License for all electrical work (a qualified subcontractor can be used) and a design member who possesses a valid California Registered Civil's or Structural Engineer's license For general questions or issues involving access and download of the electronic submittal documents, contact: City of Ontario Purchasing Department (909) 395-2012 Q&A Deadline February 13, 2025 5:30 PM (PST) City of Ontario Purchasing Department (909) 395-2012 Confirmed shortlist.
Final Planning
Water / Sewer
$8,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2025
April 29, 2025
Multiple Locations, Ontario, CA
Related To This Project
Ontario, CA
Bid Date: Feb 20 2025
Ontario, CA
Bid Date: Feb 27 2025
Ontario, CA
Bid Date: Apr 01 2025
Ontario, CA
Bid Date: Feb 10 2025
Ontario, CA
Bid Date: Mar 05 2025
Ontario, CA
Bid Date: Mar 06 2025
Ontario, CA
Bid Date: Mar 20 2025
Ontario, CA
--
Ontario, CA
Bid Date: Feb 04 2025
Ontario, CA
Bid Date: Jan 21 2025
Ontario, CA
Bid Date: Jan 31 2025
Ontario, CA
--
Ontario, CA
Bid Date: Nov 12 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
