BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2025 at 7:00 PM

Updated March 1, 2025

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000286908 Question Acceptance Deadline 2025/02/25 01:00:00 PM EST Supply and Delivery as and if Required Steel Traffic Signal & Pedestrian Corridor Structures. Duration: 1 Year Option: Four (4) - One (1) Year Optional Extensions This Specification covers all operations necessary for and pertaining to the supply of materials, fabrication, hot-dip galvanizing and delivery of steel traffic signal and pedestrian corridor structures. The Work shall be done in accordance with these Specifications and as shown on the Drawings. The Work by the Contractor shall include the furnishing of all superintendence, overhead, labour, materials, equipment, tools, supplies, and all things necessary for and incidental to the satisfactory performance and completion of all Works as hereinafter specified. Quantities of components to be provided are detailed in the request for pricing. Drawings and this Specification are complimentary and are to be read in conjunction. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 31, 2025

Project location map

Multiple Locations, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.