Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Site work and paving for a mixed-use development in Fort Smith, Arkansas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and bridge / tunnel.
Plans call for a interconnected 14-mile loop which will consist of a paved share-use path and other associated pedestrian facilities throughout the city. The project will also install five rectangular rapid flashing beacons, two high intensity activated crosswalks and seven modified traffic signals. The project will also include 3,300 feet of segmental block regaining walls, 17 railroad track crossings, a bridge underpass, a tunnel underpass and three active transportation bridges. As of February 4, 2025, information regarding a design team or a general contractor is not available. Construction is anticipated to begin in September 2028. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Roads / Highways
$25,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2028
Multiple Locations, Fort Smith, AR
Related To This Project
Fort Smith, AR
Bid Date: Feb 20 2025
Fort Smith, AR
Bid Date: Feb 14 2025
Fort Smith, AR
Bid Date: Mar 07 2025
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Mar 04 2025
Fort Smith, AR
Bid Date: Mar 11 2025
Fort Smith, AR
Bid Date: Mar 11 2025
Fort Smith, AR
Bid Date: Mar 12 2025
Fort Smith, AR
Bid Date: Feb 18 2025
Fort Smith, AR
Bid Date: Feb 13 2025
Fort Smith, AR
Bid Date: Feb 07 2025
Fort Smith, AR
Bid Date: Feb 04 2025
Fort Smith, AR
Bid Date: Feb 06 2025
Fort Smith, AR
Bid Date: Feb 05 2025
Fort Smith, AR
Bid Date: Feb 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
