BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated June 17, 2025

Site work, paving and outdoor lighting for a mixed-use development in Woodland Park, Colorado. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000373709 Delivery Point: 2000 Evergreen Heights Dr, Woodland Park, CO 80863 Bid Intent Not Available The City of Woodland Park is seeking assistance from design and construction professionals. In review of a RFI, for the Phase one plan at the Meadowood Sports Complex for budget purposes. In 2023 the City Partnered with Logan Simpson to develop a Master Plan for Meadow Wood Sports Complex. In this plan several upgrades and updates were identified. The City has elected to follow the Bear Concept found on page 8 of the master plan. The following are the items that the City would like to focus on in Phase 1. Roof over the ice rink (necessary supporting facilities, chillers and repairs to concrete rink floor) Repurposing existing tennis courts to pickleball New tennis courts Two multipurpose fields (turf) Add parking, roadway to new multipurpose field and alter existing front paved lot to work with new hockey facility Resurface turf on Panther Field Drainage study to improve drainage throughout the Meadowood Sports Complex Sport facility lighting (Panther Field, new multipurpose fields, and new pickleball) It is the goal of this RFI to help develop an ala carte route for completion and budget numbers for the design and construction phases of the project. After the numbers for the design and construction are completed. It is the desire of the City to schedule a 1-hour meeting ( vitual or In person) with the professional firm that submitted. To better understand the route and numbers that were provided. Upon completion of this RFI the City will post RFP's that best suit the route of project completion chosen by the City. Please submit a brief written outline in your own format. That your firm feels, would be the best way to see the design and construction to completion for Phase 1. Question Deadline 02/07/2025 at 5:00 PM MT Questions are submitted online Yes

Post-Bid

Playgrounds / Parks / Athletic Fields

$185,000.00

Public - City

Outdoor Lighting, Paving, Site Work

20

5

15

6

Subscribe For Documents

139 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
1
Bidding Soon
821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

June 16, 2025

Project location map

2000 Evergreen Heights Dr, Woodland Park, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.