Site work for a water / sewer project in Monticello, New York. Completed plans call for site work for a water / sewer project.
** As of April 1, 2025 this project has not yet been awarded. A timeline for the award has not yet been established.** 1. 2025 Chip Sealing & Crack Sealing of Various County Roads (B-25-05) 2. Cleaning of Leachate Lines, Toe Drains, Force Mains and Sumps at the Sullivan County Landfill (B-25-06) The Sullivan County Landfill Phase I leachate collection system consists of six (6) cells, each with three to four primary collection lines and a sump. The maximum length of an individual line is 1,000 feet with an inside diameter of six (6) inches. The pipe material in cells 1,2,3 and 6 is high density polyethylene (HDPE) and in cells 4 and 5, polyvinyl chloride (PVC). Each collection line in cells 1 through 5 extends the full length of the cell with a cleanout at each end. At the sump end of each cell is a cleanout cross connection which terminates in the sump. In cell 6, the three primary leachate collection lines terminate in the sump. Sump access is through an 18-inch or 24-inch HDPE side slope pipe riser. All lines and sumps shall be cleaned on an annual basis. Truck access is within ten feet of all cleanouts and sumps via a paved perimeter road. The inactive (capped) County landfill and Village of Monticello landfills each have a perimeter toe drain collector with cleanouts which terminate at pump stations. The inactive County Landfill toe drain measures 3,560 feet and consists of four (4) inch diameter HDPE. The Village landfill toe drain measures 2,100 feet and consists of four (4) inch diameter PVC. A two (2) inch diameter HDPE force main connects pump stations between these two landfills. Truck access is generally within ten feet of the cleanouts along a paved or gravel perimeter road. Two access points require the traversal over the landfill cap. A smaller truck, harden trailer jetter, model 4016 or equivalent, will be required at toe drain locations. LINE CLEANING METHOD: The County Landfill Phase I collection lines shall be cleaned (flushed) continuously in one direction, utilizing a vactor jet rodder with pulsator until the cleaning nozzle exits the other end of the line with the exception of cell 6, in which case the termination is in the sump. The vendor's equipment MUST be capable of handling 1,000 feet of hose on the reel and delivering 80 gpm at 2,500 psi. Confined space entry MAY be required at toe drain pump stations. SUMP AND PUMP STATION CLEANING AND CONTENTS REMOVAL: At the conclusion of the cleaning of the leachate collection lines, all sumps (6) and toe drain pump stations (6) shall be cleaned with a combination vactor jet rodder and vacuum tanker truck. The Vac Truck is required to have at minimum 150' of flexible suction line to clean cells 1 through 6. All contents shall be removed and transported to a licensed wastewater treatment plant. All transported liquid contents shall be weighed at the landfill scalehouse prior to leaving the site. CAMERA INSPECTION: At the discretion of the County, the contractor shall perform a camera inspection utilizing a six (6) inch crawler camera. A video shall be made of each pipe cleaning and provided to the County on completion. SCALE REMOVAL: In the event that an obstruction is encountered, removal shall be accomplished using a hydraulic diamond tip cutter. Once an obstruction is removed, the line shall again be inspected with the camera for purposes of confirmation.
Bid Results
Water / Sewer
$35,583.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
April 1, 2025
91 Landfill Dr, Monticello, NY
Related To This Project
Monticello, NY
Bid Date: Jan 24 2025
Monticello, NY
Bid Date: Feb 21 2025
Monticello, NY
--
Monticello, NY
--
Monticello, NY
--
Monticello, NY
Bid Date: Feb 21 2025
Monticello, NY
Bid Date: Mar 21 2025
Monticello, NY
--
Monticello, NY
Bid Date: Jan 30 2025
Monticello, NY
Bid Date: Dec 13 2024
Monticello, NY
Bid Date: Dec 13 2024
Monticello, NY
--
Monticello, NY
--
Monticello, NY
Bid Date: Nov 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.