Site work and paving for a bridge / tunnel in Monticello, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of March 17, 2025 the project has not been awarded yet. The timeline for award has not yet been established.** 1. Pile Driving Installation for County Bridge 270 (B-25-11) The Scope of Work includes, but is not limited to: A. Procure, fabricate and install templates to aid in layout of steel H-pile. B. Drive twelve (12) HP12x63 A572 Grade 50 abutment piles to a minimum embedment depth of thirtyeight feet (38) on both abutments or further as ordered by the County Engineer should the required load capacity not be achieved as shown on the contract plans. The contractor shall furnish the piles with pile shoes attached to each pile. Splices will not be allowed due to the short estimated length. The contractor shall cut each pile to the cut-off elevation shown on the plans. Dynamic pile testing shall be performed on one (1) H-pile in each abutment to determine load capacity and driving criteria. C. The unit bid price for this work shall include the cost of all labor, materials and equipment necessary to complete this work, including piles and shoes, driving equipment, dismantle and removal of pile driving equipment upon completion. D. All bidders are recommended to inspect the project sites prior to bidding to become acquainted with the locations and conditions under which the work will be accomplished. (See Location Map). E. Sullivan County shall provide Dynamic Pile Testing by an independent consultant. F. Sullivan County shall provide Survey Layout and Control for each location an H-pile shall be driven by the Contractor. G. Sullivan County shall obtain all NYSDEC permits and provide erosion control measures. H. Sullivan County shall excavate to the bottom of the proposed concrete stem at each site. I. Sullivan County shall coordinate relocation of overhead utilities.
Bid Results
Bridges / Tunnels
$117,920.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2025
May 1, 2025

Multiple Locations, Monticello, NY
Related To This Project
Monticello, NY
--
Monticello, NY
--
Monticello, NY
--
Monticello, NY
Bid Date: Feb 21 2025
Monticello, NY
Bid Date: Mar 21 2025
Monticello, NY
--
Monticello, NY
--
Monticello, NY
Bid Date: Mar 27 2025
Monticello, NY
Bid Date: Jan 24 2025
Monticello, NY
--
Monticello, NY
Bid Date: Feb 04 2025
Monticello, NY
Bid Date: Jan 30 2025
Monticello, NY
Bid Date: Dec 13 2024
Monticello, NY
Bid Date: Dec 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.