BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Site work and paving for a mixed-use development in Williston, North Dakota. Completed plans call for site work for a development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

13th Ave West Roadway Improvements & Detention Pond 8 - Phase 1A The project involves installation of utilities including water, sewer and storm drain on 13th Ave West Phase 1A, and Construction of Detention Pond 8 in Williston, North Dakota. This includes approximately 694 lineal feet of various sized RCP storm drain pipe, 1,200 lineal feet of various sized sanitary sewer pipe, and 1,300 feet of various sized water pipe and associated appurtenances along with 62,400 square feet of Asphalt, 3,150 linear feet of curb and gutter, and 19,500 square feet of concrete flatwork. The project has a 120-calendar day construction schedule from the construction initiation date. The project must be substantially complete no later than October 15,2025. The final completion date is October 25, 2025. Site Directions: Within Williston Square. Site Address: 13th Ave West Question Deadline 01/29/2025 Via email to James Hammon @ jsh@allianceconsulting.us Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Conservation and Development

$2,794,101.00

Public - City

Paving, Site Work

102

17

24

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 7, 2025

Project location map

13th Ave W, Williston, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.