BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 28, 2025

Site work and paving for a mixed-use development in Sun City, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construct 1.0 mile of roadway and improvements to conform to the 2010 ADA Standard for Accessible Design. The work includes constructing concrete curb and gutter, sidewalk ramps, valley gutters, as well as other incidental work. Q & A deadline: Feb 13, 2025 2:00:00 PM MT. Questions or clarifications regarding the bid documents shall be addressed through Periscope S2G under the Questions and Answers link. Minor administrative questions may be sent to Article 5 Procurement Officer, Corry Slama at corry.slama@maricopa.gov. CONTRACT TIME All construction work on this contract is to be completed within 90 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 210 CALENDAR DAYS. As a guarantee that the contractor will enter into a contract, each bid shall be accompanied by a surety bond, certified check, cashier's check, or money order. The bid security amount shall be 10 percent of the contractors bid made payable to the TREASURER OF MARICOPA COUNTY as a guarantee that if the work is awarded to the bidder, the bidder will, within 10 days from the date of Notice of Award, enter into proper contract and bond condition for the faithful performance of the work, otherwise, said amount may be forfeited to the Board of Supervisors as liquidated damages. The undersigned shall maintain at all times a payment and performance bond, approved by the Board of Supervisors, each in an amount equal to 100 percent of the contract amount. This bond shall serve not only to guarantee the completion of the work on the part of the undersigned but also to guarantee the excellence of both workmanship and material and the payment of all obligations incurred, said bonds and sureties to be in full force and effect until the work is finally accepted and the provisions of the plans, construction specifications, and Construction Special Provisions fulfilled. The Board of Supervisors reserves the right to reject any and all bids and to waive any informality in any bid received. Rejection of Bids The owner reserves the right to reject any and all bids. Any bid that is incomplete, conditional, obscure, or that contains irregularities of any kind may be cause for rejection of the bid. Addendum #1-#2 have been issued as of 2-24-2025.

Post-Bid

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

70

7

81

5

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
1
Bidding Soon
632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.