Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work for a water / sewer project in West Allis, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of March 20, 2025, the project was awarded to Musson Bros., Inc, with an awarded amount of $344,000.** The work under this contract consists of cleaning and lining sanitary lateral connections using cure-in-place-pipe technology. Sanitary sewer mainline sizes range in diameter from 8-inch to 15-inch. Pre-Qualification: Yes and consisting of the following approximate quantities: 1. Sanitary Sewer Connection Liner 70 Units 2. Temporary Exterior Lateral Cleanout 10 Units 3. Traffic Control 1 Lump Sum in the City of West Allis, Wisconsin, in accordance with Plans and Specifications on the Quest Bidding Website. Bidders must file pre-qualification questionnaires with the Director of Public Works/City Engineer, as required by Section 66.29 of the Wisconsin Statutes. All questions about the meaning or intent of the contract documents are to be directed to the City Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by addenda mailed or deliveredtoallparties recordedby theEngineer ashaving received proposal forms. Questions received less than ten (10) days priorto the date foropeningofbids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bidders must file pre-qualification questionnaires with the Director of Public Works/City Engineer, as required by Section 66.29 of the Wisconsin Statutes. Architectural Services M.B.E. Goal - 4% Construction and Purchasing M.B.E. Goal - 4% Female Owned Business Participation M.B.E. Goal -6.9% It is anticipated that the Notice to Begin Work on this project will be given on or about March 3 rd , 2025. All work under this Contract shall be completed by November 3 rd , 2025. The primary purpose ofthisContractis to rehabilitate the connectionof sanitary laterals to themainline sanitary sewer using trenchless technology. On typical lateral configurations,theCity is looking tocover a minimum of 2 feet into the lateral so that the first joint and mainline connection is covered. If the awarded Contractor is interested, the City is able to include in the Notice of Construction letter, the option to have the lateral liner extended. This additional work would be paid for by the Property Owner and coordinated directly between the Property Owner and the Contractor, if the Owner is interested

Award

Water / Sewer

$344,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
163
Bidding Soon
2,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 3, 2025

Project location map

Multiple Locations, West Allis, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.