Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work and new construction of a civil project in Gonzales, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

In accordance with Drawings and Specifications prepared by Dudek, the Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the "Industrial Wastewater Treatment Facility". The Work includes but is not limited to: all labor, material, equipment, and services necessary to complete the work in compliance with the specifications, including but not limited to construction of the following: 1. Two Aerated Lagoon Treatment Ponds. 2. Two Infiltration Basins. 3. Recirculation Pump Station. 4. Influent Pump Station. 5. Headworks. 6. Blower Building. 7. Standby Generator and Pad. 8. Motor Control Centers, Variable Frequency Drive Units, Switchgear. 9. PG&E Service Transformer Pad. 10. Potable Water Service. 11. Operations, Storage, and Electrical Building 12. New SCADA control system and integration. 13. Drilling, construction, and development of six underground monitoring wells. 14. Process and site piping, and appurtenances. 15. Paving, grading, drainage, sitework, etc. in accordance with the Approved Plans and Specifications, including all associated materials, service connections, appurtenances and other Work. The estimated cost for this Work is between: $19.5M and $20M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contract Time for the completion of all the Work of the Project is 420 Working Days. Each Bid must also be accompanied by security in the form of a Bidder's Bond issued by a corporate surety, a certified check, or cashier's check payable to the "City of Gonzales, CA", or cash for an amount not less than ten percent (10%) of the Total Bid Price. The successful Bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, in conformance with the requirements set forth in the Contract Documents, each for not less than one hundred percent (100%) of the Contract Price. Question Deadline 02/18/2025 Inquiries must be submitted via electronic telecommunication (e-mail) to: Megan Panofsky, mpanofsky@mnsengineers.com The City reserves the right to award the Contract, to reject any or all Bids, to waive non-material and inconsequential irregularities in any Bid, and to reject nonconforming, nonresponsive, non-responsible, or conditional Bids.

Bid Results

Water / Sewer

$21,938,000.00

Public - City

New Construction, Site Work

135

30

56

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
8
Bidding Soon
742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 7, 2025

Project location map

500 Short Rd, Gonzales, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.