BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Renovation of a fire / police facility in Fort McCoy, Wisconsin. Completed plans call for the renovation of a fire / police facility.

In general, the work consists of: renovating and updating several Academy dorm bathrooms and Academy dorms. Bathroom renovation includes existing wall surface to be removed and replaced, new toilet and shower fixtures provided, and new solid surface shower surround and vanity top and sinks. Dorm renovation includes existing carpet flooring to be removed and replaced, paint walls and ceiling. New energy efficient lighting fixtures. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. All bids received from contractors who are not certified will be rejected. contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page: online or upon request from DFD--email 24 dfdcertification@wisconsin.gov. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors.

Award

Fire / Police

$323,604.00

Public - State/Provincial

Renovation

27

23

2

3

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
48
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

June 1, 2025

Project location map

95 S 10th Ave, Fort McCoy, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.