BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 25, 2025

Site work, paving and new construction of a mixed-use development in Union, Missouri. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County: City of Union, MO / East Main Street Bridge Location: E Main St, just west of MO 47 Proposed Improvement: New bridge on E Main St at the unnamed tributary to Flat Creek, stream channel alignment, streambank stabilization, earthwork, grading, storm drainage and pavement construction, relocation of utilities, add ADA-compliant sidewalk and pedestrian improvements, signing and striping. Length: 0.17 miles DBE Goal : 10% Engineering responsibilities may include but are not limited to preparation of Conceptual plans, Preliminary plans, Contract plans, and Right of Way plans. Design services may include but are not limited to surveying, geotechnical investigations, traffic studies and reports, ADA compliance survey, subsurface utility exploration, hydraulics, storm sewer design, bridge design, intersection design, roadway design, streambank stabilization design, public involvement, environmental and historic preservation services/permits, contract documents, assisting with the bidding process, utility coordination/permits, and traffic controls design, including preparation of PS&E and final documents. Construction engineering responsibilities may include but are not limited to work with contractor on behalf of the City, assist with preconstruction conference, construction inspection, inspection and testing construction materials, construction support, prepare change orders, review shop drawings and material submittals, be present during critical construction operations, work with City to do full time inspections and reporting and participate in final inspection. The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ Engineering - New Bridge at the Unnamed Tributary to Flat Creek, Stream Channel Alignment, Streambank Stabilization

Conceptual

Bridges / Tunnels

$1,084,038.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
80
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

Project location map

E Main St, Union, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.