BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Union, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of work involves the supply of all essential materials, equipment, transportation, and skilled labor for the purpose of installing median islands at the intersection of Church St and Independence Dr. Any questions or clarifications concerning this Advertisement for Bid must be submitted via email to: J.D. Kelley, City Engineer, engineer@unionmissouri.gov. Proposals must be submitted on the Bid Form provided by the City of Union and placed in a sealed envelope addressed to the City of Union bearing the name and address of the bidder and clearly marked "FY2025 CHURCH ST & INDEPENDENCE DR MEDIAN ISLANDS" or they will not be considered. Proposals shall be mailed or delivered to the Office of the City Clerk, City of Union, 10 East Locust, Union, Missouri 63084. The Contractor and all subcontractors will be required to comply with all applicable State Regulations including Equal Employment Opportunities, Non-segregated Facilities, Prevailing Wage Rates and Affirmative Action Requirements, and all other work incidental thereto as described in the Contract Documents. Any person signing a contract to work on the construction of public works for any public body shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees which includes a course in construction safety and health approved by OSHA or a similar program approved by the department which is at least as stringent as an approved OSHA program. All employees are required to complete the program within sixty days of beginning work on such construction project. The Owner reserves the right to waive any informalities or irregularities and to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the information for bidders. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The purpose of the Contract Documents is to provide for the furnishing of all equipment, materials and labor required to complete the Project as set forth herein. The successful Bidder will be required to furnish equipment, materials, and workmanship complying with the requirements of the Contract Documents TheBidders shallfamiliarize themselves with the contemplated Work to insure the fulfillment of the intent of the Contract Documents. B. Any Bidder who is in doubt as to the true meaning of any part of the Contract Documents shall promptly request from the City of Union an interpretation thereof. C. Interpretations will be made only by addendum, duly issued, and two copies of each addendum will be delivered to each party who has received sets of these Documents. D. No interpretation addendum will be issued within the last three (3) days before the Bid date. E. The Bidder shall be solely responsible for any explanation of interpretation of the Contract Documents other than by duly issued addenda. The Contractor shall accept the compensation as herein provided in full payment for furnishing all materials, labor, services, supervision, tools and equipment necessary to complete the work; and for performing all work contemplated and embraced under the contract; and for loss or damage arising from the nature of the work or from the action of the elements, except as herein before provided; or from any unforeseen difficulties which may be encountered during the prosecution of the work until the acceptance by the Owner; and for all risks of every description connected with the prosecution of the work; and for all expenses incurred in consequent of the suspension of discontinuance of the work as herein specified; and for completing the work according to the Plans and Specifications. The payment of any estimate or of any retained percentage shall not relieve the Contractor of any obligation to replace or to make good any defective work or material.

Bid Results

Roads / Highways

$13,535.00

Public - City

Paving, Site Work

3

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
37
Bidding Soon
884
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

Church St. & Independence Dr, Union, MO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.