BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work for a water / sewer project in Portland, Oregon. Completed plans call for site work for a water / sewer project.

Treatment of Construction Dewatering Containing PFAS Question Deadline 02/21/2025 at 5:00 PM PT Online Q&A Yes, Through the Port's online bidding system. Questions received fewer than five (5) business days prior to the deadline for receipt of proposals may not be considered. Future construction projects at PDX will include underground facilities (e.g., utilities) that may be installed below the groundwater table requiring construction dewatering. Because of past use of firefighting foams, PFAS may be present in the groundwater in the project areas. Construction dewatering is subject to permits that place limitations on chemical concentrations in the discharge water and may include PFAS compounds. Unique features of addressing PFAS in construction dewatering at PDX include the following: o Although overall project durations may be months or years, individual work tasks may be in areas of active aircraft movement that could limit operation windows to a few days. o PDX is constructed on the Columbia River floodplain with highly variable soil conditions. Construction dewater flow rates may vary from less than 1 gallon per minute (gpm) to greater than 300 gpm. o Depending on project location, influent concentrations may vary from near detection limits to the concentrations listed below. Target treatment levels may vary from project to project. Discharge to sanitary sewer could require treatment to below detection limits, whereas land application requirements could be greater than EPA drinking water maximum contaminant levels (MCLs). Assume that the typical treatment target would be EPA MCLs. o The regulation of PFAS is rapidly evolving so discharge limits could change. Work may be in areas of historical releases of jet fuel. Treatment of water for PFAS would need to allow for the potential presence of petroleum hydrocarbons

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
29
Bidding Soon
1,037
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.