Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 3, 2025 at 7:00 PM
Updated March 4, 2025
Site work, paving and outdoor lighting for a mixed-use development in Houston, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a bridge / tunnel.
The project involves fully reconstructing Montrose Blvd from Allen Parkway to W Clay Street. There will be 10'x10' reinforced concrete boxes for 5 ac-ft of inline detention, four lanes of concrete pavement, ADA-compliant 4 to 8-foot-wide sidewalks and ramps, BOOST bus stops, a ped and bike bridge with a decorative metal cladding system over the Allen Parkway underpass, existing bridge modifications, a retaining wall (up to 8 feet in height), full traffic signal replacement at W Dallas Street, partial traffic signal replacement at Allen Parkway, a new HAWK signal at W Clay Street, tree protection, new tree planting, sanitary sewer and water line improvements, and city-owned street lighting. The deadline to ask questions is 2/09/2025 11:00 PM CST
Bid Results
Sidewalks / Parking Lot
$17,896,003.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
February 28, 2025
Montrose Blvd, Houston, TX
Related To This Project
Houston, TX
Bid Date: May 24 2021
Houston, TX
Bid Date: Feb 19 2025
Houston, TX
Bid Date: Feb 11 2025
Houston, TX
Bid Date: Feb 11 2025
Houston, TX
Bid Date: Feb 13 2025
Houston, TX
Bid Date: Apr 07 2025
Houston, TX
Bid Date: Feb 11 2025
Houston, TX
Bid Date: Feb 24 2025
Houston, TX
Bid Date: Feb 11 2025
Houston, TX
Bid Date: Jun 26 2025
Houston, TX
Bid Date: Feb 10 2025
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Jan 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
