BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 18, 2025

Site work and new construction of a civil project in State Center, Iowa. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Furnishing of all material, equipment, and labor for construction of a new cast-in-place dry well structure, pumps, and associated piping, valves, and appurtenances, electrical and controls improvements, and demolition and removal of the existing valve vault structure and removal of existing interior wet well equipment. Work also includes, but is not limited to, grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the Work in accordance with Drawings and Specifications. Furnishing of all material, equipment, and labor for construction of a new packaged lift station, appurtenances, electrical and controls, and demolition and removal of the existing valve vault structure and removal of existing interior wet well equipment. Work also includes, but is not limited to, grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the Work in accordance with Drawings and Specifications. Each proposal shall be accompanied by a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidder's bond with corporate surety satisfactory to the City in an amount equal to ten percent (10%) of the total amount of the proposal. If bid bond is submitted, it must be in the form provided in these Specifications. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the City insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa and must not contain any conditions either in the body or as an endorsement thereon. The successful bidder will be required to furnish a corporate surety bond in an amount equal to one hundred per cent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the City. The Work on this project shall commence within ten (10) days after receipt by the contractor of a written Notice to Proceed. The Project shall be substantially completed by October 31, 2025, and will be completed and ready for final payment on or before December 1, 2025 subject to any changes in the contract period as provided for in these Specifications. Liquidated damages in the amount of $500 per calendar day will be assessed for each day that the Work shall remain uncompleted after the substantial completion date with due allowance for extensions of the contract period due to conditions beyond control of the Contractor. The City reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days from the date of receipt of bids. The City reserves the right to reject any or all bids and to waive informalities.

Award

Water / Sewer

$1,740,000.00

Public - City

New Construction, Site Work

41

18

42

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
107
Bidding Soon
1,246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 14, 2025

Project location map

Eastman Ave, State Center, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.