EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Prescott, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Scope Of Work For This Project Includes Furnishing All Labor, Materials, Equipment, Fixtures, And Services Required For The Placement Of A Crs-2p 3/8" Chip Seal In Black Canyon City. Total Estimated Quantity Of Areas To Receive A Crs-2p 3/8" Chip Seal Is Approximately 308,497 Square Yards. The Total Amount Of Fog Seal Coat Is Estimated At 30,850 Gallons. Re-establishing Existing Paint Striping And Markings, Where Applicable, Is Also Included In This Contract And As Specified On The Plans. All Work Is To Be Done In Accordance With The Plans, Specifications, And Contract Documents. Bids Shall Include All Applicable Taxes And Must Be Accompanied By A Proposal Guaranty In The Form Of A Certified Check, Cashier's Check, Or Surety Bond In The Amount Of Ten Percent (10%) Of The Contract Price Bid, Made Payable To The Yavapai County Board Of Supervisors. Each Proposal Shall Be Submitted By Hand, U.s. Postal Service, Or Other Carrier To The Yavapai County Board Of Supervisors, 1015 Fair Street, Room 310, Prescott, Arizona 86305. Yavapai County Will Not Be Responsible For Submitted Bids Not Marked Appropriately And/or Sent To The Wrong Address. Bidders Are Invited To Be Present At The Opening Of Bids, But Absence Will Not Be Considered Cause For Disqualification. Bidders Shall Be Responsible For Any Licenses Or Permits Required By The Regulatory Agency Of The State Of Arizona That Apply To The Performance Of This Contract. The Board Of Supervisors Of Yavapai County Reserves The Right To Reject Any Or All Bids, To Waive Formalities, And To Accept The Bid Deemed To Be In The Best Interest Of Yavapai County.

Award

Roads / Highways

$1,177,992.00

Public - County

Paving, Site Work

7

8

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
14
Bidding Soon
369
All Active Projects
150
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 17, 2025

img_map_placeholder

Multiple Locations, Prescott, AZ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Chip Seal

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.