BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of a stadium in Kerrville, Texas. Completed plans call for the renovation of a stadium.

The project shall be lump sum and consists of the following work described for retrofits to the structural framing of the Kerr County Indoor Arena located at 3785 SH 27, Kerrville, TX 78028: removal, replacement, and disposal of damaged existing framing; repair of damaged existing framing; installation of new bracing for existing columns, rafters, and purlins; and modification of existing framing connections. Work shall be coordinated with ongoing roof panel, liner and insulation removal and replacement under separate contract. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening. Awarded contracts for projects exceeding $50,000 must include a payment bond for the full amount of the contract price. Awarded contracts for projects exceeding $100,000 must include both payment and performance bonds in the amount of one hundred percent (100%) of the total contract price. Vendor Questions Due: 2:00 PM, January 31, 2025 Vendor Questions Answered: 4:00 PM, February 5, 2025 All questions regarding this project shall be directed to Charlie Hastings, P.E., County Engineer at 830-896-9046 (phone) and chastings@co.kerr.tx.us (email) The date and time of opening the bids shall be clearly marked on the outside of the sealed envelope. Construction substantial completion time will be 60 calendar days for final completion from the date of written notice to proceed. Working days are defined in specification section 123.20. The Contractor's obligations to the project however, are not complete and retainage will not be released until all disturbed areas within County property have been restored to pre-existing conditions to the satisfaction of the County Engineer. Liquidated damages are hereby established for work which is not substantially complete in the amount of Three Hundred Dollars ($300.00) per calendar day for each calendar day after the date established in the Notice to Proceed. The County may, from time to time, offset any such liquidated damages against any sums due from the County to Contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $50,000 - $70,000

Award

Arenas / Stadiums

$85,690.00

Public - County

Renovation

8

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
59
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 12, 2025

Project location map

3785 TX-27, Kerrville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.