Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 28, 2025 at 7:00 PM
Updated March 1, 2025
Renovation of a stadium in Kerrville, Texas. Completed plans call for the renovation of a stadium.
The project shall be lump sum and consists of the following work described for retrofits to the structural framing of the Kerr County Indoor Arena located at 3785 SH 27, Kerrville, TX 78028: removal, replacement, and disposal of damaged existing framing; repair of damaged existing framing; installation of new bracing for existing columns, rafters, and purlins; and modification of existing framing connections. Work shall be coordinated with ongoing roof panel, liner and insulation removal and replacement under separate contract. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening. Awarded contracts for projects exceeding $50,000 must include a payment bond for the full amount of the contract price. Awarded contracts for projects exceeding $100,000 must include both payment and performance bonds in the amount of one hundred percent (100%) of the total contract price. Vendor Questions Due: 2:00 PM, January 31, 2025 Vendor Questions Answered: 4:00 PM, February 5, 2025 All questions regarding this project shall be directed to Charlie Hastings, P.E., County Engineer at 830-896-9046 (phone) and chastings@co.kerr.tx.us (email) The date and time of opening the bids shall be clearly marked on the outside of the sealed envelope. Construction substantial completion time will be 60 calendar days for final completion from the date of written notice to proceed. Working days are defined in specification section 123.20. The Contractor's obligations to the project however, are not complete and retainage will not be released until all disturbed areas within County property have been restored to pre-existing conditions to the satisfaction of the County Engineer. Liquidated damages are hereby established for work which is not substantially complete in the amount of Three Hundred Dollars ($300.00) per calendar day for each calendar day after the date established in the Notice to Proceed. The County may, from time to time, offset any such liquidated damages against any sums due from the County to Contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $50,000 - $70,000
Award
Arenas / Stadiums
$85,690.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2025
March 12, 2025
3785 TX-27, Kerrville, TX
Related To This Project
Kerrville, TX
Bid Date: Feb 21 2025
Kerrville, TX
Bid Date: Mar 14 2025
Kerrville, TX
Bid Date: Mar 10 2025
Kerrville, TX
Bid Date: Apr 03 2025
Kerrville, TX
--
Kerrville, TX
Bid Date: May 28 2025
Kerrville, TX
Bid Date: May 14 2025
Kerrville, TX
Bid Date: Feb 05 2025
Kerrville, TX
--
Kerrville, TX
Bid Date: Sep 03 2020
Kerrville, TX
Bid Date: Nov 24 2020
Kerrville, TX
Bid Date: Mar 04 2021
Kerrville, TX
Bid Date: Dec 13 2024
Kerrville, TX
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
